Here’s a list of the legislator-sponsored infrastructure projects in House Bill 219, the amounts they’re funded for, the difference between what was originally requested and the original request.
Lawmakers had $82 million to divvy up in the severance tax bond bill for capital outlay projects.
A downloadable, more detailed version with the original description and each sponsor is available here.
Project | Amount | Difference | City | County | Total Project request |
---|---|---|---|---|---|
LEA CO JUDICIAL COMPLEX LOVINGTON | $60,000 | ($39,940,000) | Lovington | Lea | $40,000,000 |
ALB NORTH DOMINGO BACA PARK AQUATICS FCTY | $100,000 | ($13,100,000) | Albuquerque | Bernalillo | $13,200,000 |
HOBBS SEWER LINES/MANHOLES IMPROVE | $431,000 | ($11,569,000) | Hobbs | Lea | $12,000,000 |
ALB PETROGLYPH NATL MNMT OPEN SPACE PRJT LAND | $115,000 | ($9,385,000) | Albuquerque | Bernalillo | $9,500,000 |
SANTA FE CO EAST MOUNTAIN AREA HEALTH CARE FCLTY | $242,000 | ($7,802,717) | Edgewood | Santa Fe | $8,044,717 |
MESILLA RD IMPROVE MESILLA | $100,000 | ($7,630,187) | Mesilla | Dona Ana | $7,730,187 |
HOBBS AEROBIC DIGESTION BASINS | $100,000 | ($7,500,000) | Hobbs | Lea | $7,600,000 |
FLORA VISTA MDWA WWATER SYS | $3,000,000 | ($6,100,000) | San Juan | $9,100,000 | |
TOOH HALTSOOI CHP MLTPRPS BLDG CONSTRUCT | $150,000 | ($4,850,000) | Tooh Haltsooi Chapter | San Juan | $5,000,000 |
LEA CO REGIONAL AIRPORT TERMINAL RENOVATE | $420,000 | ($4,830,000) | Hobbs | Lea | $5,250,000 |
ROOSEVELT CO SPECIAL HOSPITAL DISTRICT EXPANSION | $120,000 | ($3,080,000) | Roosevelt Co Spec Hosp Dis | Roosevelt | $3,200,000 |
4TH ST REPAIR LOS RANCHOS DE ALBUQUERQUE | $250,000 | ($2,750,000) | Los Ranchos de Albuquerque | Bernalillo | $3,000,000 |
ALB NORTHWEST MULTIGENERATIONAL CENTER | $25,000 | ($2,575,000) | Albuquerque | Bernalillo | $2,600,000 |
UNM ECONOMIC DVLP MLTPRPS EVENTS CTR | $210,000 | ($2,570,689) | Albuquerque | Bernalillo | $2,780,689 |
ALB EXPLORA SCI CTR & CHILDREN'S MUS LEARNING CTR | $452,000 | ($2,548,000) | Albuquerque | Bernalillo | $3,000,000 |
LAS CRUCES SEPTIC SYSTEMS REPLACE | $540,000 | ($2,460,000) | Las Cruces | Dona Ana | $3,000,000 |
HOBBS EFFLUENT REUSE SYS IMPROVE | $100,000 | ($2,330,000) | Hobbs | Lea | $2,430,000 |
QUESTA SEWER LINES TAOS CO | $100,000 | ($2,300,000) | Questa | Taos | $2,400,000 |
LADERA DR NW CONSTRUCT GAVIN/COORS | $518,000 | ($1,982,000) | Albuquerque | Bernalillo | $2,500,000 |
FARMINGTON VILLA VIEW DETENTION PONDS FCLTY | $550,000 | ($1,905,902) | Farmington | San Juan | $2,455,902 |
LOVINGTON RADIO-READ WATER METERS INSTALL | $220,000 | ($1,835,000) | Lovington | Lea | $2,055,000 |
CIBOLA CO GOVERNMENT CMPLX | $225,000 | ($1,775,000) | Grants | Cibola | $2,000,000 |
BERN CO METRO COURT SURVEILLANCE SYS & EXPANSION | $30,000 | ($1,690,000) | Albuquerque | Bernalillo | $1,720,000 |
ANGEL FIRE WATER STORAGE TANKS | $190,000 | ($1,660,000) | Angel Fire | Colfax | $1,850,000 |
PASEO DEL VOLCAN ROW BERNALILLO & SANDOVAL COS | $948,000 | ($1,652,000) | Bern/Sando | $2,600,000 | |
RATON WATER TREATMENT FACILITY RENOVATION | $50,000 | ($1,535,000) | Raton | Colfax | $1,585,000 |
QUESTA WATER SYSTEM CONSTRUCT TAOS CO | $50,000 | ($1,459,950) | Questa | Taos | $1,509,950 |
SCCCSHD CIMARRON HEALTH CLINIC CONSTRUCT/EQUIP | $24,000 | ($1,396,000) | Cimarron | Colfax | $1,420,000 |
ALB PAT HURLEY PARK & CMTY CTR IMPROVE | $145,000 | ($1,355,000) | Albuquerque | Bernalillo | $1,500,000 |
ALB JUAN TABO HILLS PARK PHASE 1 | $90,000 | ($1,316,250) | Albuquerque | Bernalillo | $1,406,250 |
ALB LOS ALTOS POOL & PARK RENOVATE | $35,000 | ($1,265,000) | Albuquerque | Bernalillo | $1,300,000 |
ARTESIA WATER TOWER | $360,000 | ($1,240,000) | Artesia | Eddy | $1,600,000 |
CURRY CO ROADS 4/10/D/V | $250,000 | ($1,185,000) | Curry | $1,435,000 | |
SAN MIGUEL CO SEPTIC RECYCLING FCLTY | $30,000 | ($1,170,000) | San Miguel | $1,200,000 | |
BERN CO METROPOLITAN COURT CONSTRUCT | $497,500 | ($1,123,380) | Albuquerque | Bernalillo | $1,620,880 |
SUNSET RD SW IMPROVE-BERN CO | $300,000 | ($1,085,000) | Bernalillo | $1,385,000 | |
CHAPARRAL WASTEWATER SYS PH 1C DONA ANA CO | $300,000 | ($1,074,000) | Chaparral | Dona Ana | $1,374,000 |
SOUTH VALLEY GYM/BOXING/WRESTLING FACILITY | $143,500 | ($1,056,500) | Bernalillo | $1,200,000 | |
ALB NORTHWEST MESA LIBRARY CONSTRUCT | $50,000 | ($950,000) | Albuquerque | Bernalillo | $1,000,000 |
AGUA FRIA UTILITY CORRIDOR | $50,000 | ($950,000) | Santa Fe | $1,000,000 | |
SUNLAND PARK FIRE TRUCKS & POLICE VEHICLES | $170,000 | ($930,000) | Sunland Park | Dona Ana | $1,100,000 |
LAS CRUCES TRAFFIC SYS NETWORK IMPROVE | $100,000 | ($900,000) | Las Cruces | Dona Ana | $1,000,000 |
TEXAS ST PHASE 1 IMPROVE - CARLSBAD | $100,000 | ($900,000) | Carlsbad | Eddy | $1,000,000 |
SANTA ANA PUEBLO WELL SYS CONSTRUCT & EQUIP | $125,000 | ($875,000) | Santa Ana Pueblo | Sandoval | $1,000,000 |
LORDSBURG WATER SYSTEM IMPROVE | $125,000 | ($875,000) | Lordsburg | Hidalgo | $1,000,000 |
ALB FIRE DEPARTMENT AERIAL PLATFORM FIRE APPARATUS | $127,500 | ($872,500) | Albuquerque | Bernalillo | $1,000,000 |
SFIS ROAD & DRAINAGE IMPROVE | $50,000 | ($850,000) | Santa Fe | Santa Fe | $900,000 |
ALB BERN CO WUA CARNUEL WATER PRJT PH 2B | $50,000 | ($850,000) | Carnuel | Bernalillo | $900,000 |
UNIVERSITY AVE MULTIMODAL PATH CONSTRUCT MESILLA | $75,000 | ($825,000) | Mesilla | Dona Ana | $900,000 |
SIERRA CO ANIMAL SHELTER | $100,000 | ($800,000) | Truth or Consequences | Sierra | $900,000 |
SUNLAND PARK STREETS & DRAINAGE IMPROVE | $205,000 | ($795,000) | Sunland Park | Dona Ana | $1,000,000 |
VILLAGE OF TIJERAS SENIOR CENTER-CONSTRUCT | $30,000 | ($776,200) | Tijeras | Bernalillo | $806,200 |
ANTHONY FIRE STATION 2 RENOVATE DONA ANA CO | $50,000 | ($750,000) | Anthony | Dona Ana | $800,000 |
SOUTH VALLEY POOL & AQUATICS FCLTY PHASE 1 IMPROVE | $400,000 | ($725,000) | Bernalillo | $1,125,000 | |
ALB BERN CO WUA WATER REUSE PLANT PLAN & DESIGN | $30,000 | ($720,000) | Bernalillo | $750,000 | |
ALB CITY COUNCIL DISTRICT 6 LIBRARY CONSTRUCT | $295,000 | ($705,000) | Albuquerque | Bernalillo | $1,000,000 |
RIO RANCHO FIRE & RESCUE DEPARTMENT LADDER TRUCK | $51,000 | ($699,000) | Rio Rancho | Sandoval | $750,000 |
ACOMA PUEBLO INFO TECH AND TELECOMMUNICATIONS | $20,000 | ($690,000) | Acoma Pueblo | Cibola | $710,000 |
TAOS SKI VALLEY WASTEWATER TREATMENT PLANT | $50,000 | ($682,000) | Taos Ski Valley | Taos | $732,000 |
BERN CO PUBLIC SAFETY OFFICERS' MEMORIALS | $345,000 | ($655,000) | Bernalillo | $1,000,000 | |
POJOAQUE PUEBLO WELLNESS CENTER | $50,000 | ($650,000) | Pojoaque Pueblo | Santa Fe | $700,000 |
TRUTH OR CONSEQUENCES ANIMAL SHELTER CONSTRUCT | $101,000 | ($649,000) | Truth or Consequences | Sierra | $750,000 |
SANTA FE MUNICIPAL AIRPORT EXPAND | $855,000 | ($645,000) | Santa Fe | Santa Fe | $1,500,000 |
BERNALILLO WELL 2 ARSENIC TREATMENT SYS | $100,000 | ($641,250) | Bernalillo | Sandoval | $741,250 |
WHERRY ELEM SCHL MINI FIELDS | $55,945 | ($641,055) | Albuquerque PSD | Bernalillo | $697,000 |
MONTICELLO WATER SYSTEM CONSTRUCT | $100,000 | ($625,000) | Monticello | Sierra | $725,000 |
DONA ANA CO SHERIFF'S SUBSTATION ANTHONY | $80,000 | ($620,000) | Anthony | Dona Ana | $700,000 |
NMJC ALLIED HEALTH NURSING PROGRAM EQUIP | $140,000 | ($610,000) | Hobbs | Lea | $750,000 |
BERN CO ROUTE 66 VISITOR CENTER CONSTRUCT | $202,000 | ($598,000) | Albuquerque | Bernalillo | $800,000 |
DONA ANA CO SHERIFF SUBSTATION CHAPARRAL | $25,000 | ($575,000) | Chaparral | Dona Ana | $600,000 |
SANDIA BASE ELEM SCHL MINI FIELDS | $10,000 | ($565,000) | Albuquerque PSD | Bernalillo | $575,000 |
NM MUSEUM OF ART RENOVATE | $195,000 | ($555,000) | Santa Fe | Santa Fe | $750,000 |
EUNICE ANIMAL SHELTER | $150,000 | ($550,000) | Eunice | Lea | $700,000 |
LA UNION MDS & WA WATER SYS IMPROVE | $75,000 | ($540,468) | La Union | Dona Ana | $615,468 |
BELEN SEWER DENNIS CHAVEZ ELEM SCHL CONNECT | $300,000 | ($505,000) | Belen | Valencia | $805,000 |
SANTA FE HIGH SCHL TENNIS COURTS | $115,000 | ($485,000) | Santa Fe PSD | Santa Fe | $600,000 |
MAXWELL WATER STORAGE TANK INSTALL | $20,000 | ($480,000) | Maxwell | Colfax | $500,000 |
ALB UPTOWN AREA PED & ROADS IMPROVE | $25,000 | ($475,000) | Albuquerque | Bernalillo | $500,000 |
SUNLAND PARK STREET LIGHTING | $31,000 | ($469,000) | Sunland Park | Dona Ana | $500,000 |
OHKAY OWINGEH FIRE DEPARTMENT RENOVATE | $160,000 | ($465,000) | Ohkay Owingeh | Rio Arriba | $625,000 |
MCKINLEY CO INLAND PORT | $40,000 | ($460,000) | McKinley | $500,000 | |
SANTA FE MUNI RECREATION CMPLX FCLTY/SOCCER FIELDS | $50,000 | ($450,000) | Santa Fe | Santa Fe | $500,000 |
MUSEUM OF INDIAN ARTS & CULTURE IMPROVE | $50,000 | ($450,000) | Santa Fe | Santa Fe | $500,000 |
TAOS OLD COUNTY COURTHOUSE RENOVATE | $150,000 | ($450,000) | Taos | Taos | $600,000 |
POJOAQUE RECREATION COMPLEX IMPROVE | $137,000 | ($448,500) | Pojoaque | Santa Fe | $585,500 |
EUNICE MAINSTREET IMPROVE | $60,000 | ($440,000) | Eunice | Lea | $500,000 |
ALB SIGN LANGUAGE ACADEMY CONSTRUCT | $210,000 | ($440,000) | Albuquerque | Bernalillo | $650,000 |
ALB FOOD BANK WAREHOUSE EQUIP | $62,500 | ($437,500) | Albuquerque | Bernalillo | $500,000 |
LINCOLN AVE ROW & CONSTRUCT - RIO RANCHO | $565,000 | ($435,000) | Rio Rancho | Sandoval | $1,000,000 |
HAYES MID SCHL TRACK AREAS | $65,945 | ($434,055) | Albuquerque PSD | Bernalillo | $500,000 |
NORTH CENTRAL RTD BUSES | $93,000 | ($431,000) | Multiple Co | $524,000 | |
SANTA ANA PUEBLO PUBLIC SERVICES/JUDICIAL COMPLEX | $75,000 | ($425,000) | Santa Ana Pueblo | Sandoval | $500,000 |
PASEO DEL VOLCAN RIGHTS OF WAY SANDOVAL CO | $580,000 | ($420,000) | Sandoval | $1,000,000 | |
NMIMT JONES HALL EQUIP & FURNISH | $90,000 | ($410,000) | Socorro | Socorro | $500,000 |
AODA DIST ATT OFFICES INFO TECH & VEHICLES | $20,000 | ($404,000) | Statewide | $424,000 | |
CANJILON MDWC & MSWA IMPROVE | $100,000 | ($400,000) | Canjilon | Rio Arriba | $500,000 |
CURRY CO RD I - CLOVIS | $200,000 | ($400,000) | Clovis | Curry | $600,000 |
ELDORADO ROADS IMPROVE SANTA FE CO | $100,000 | ($400,000) | Eldorado at Santa Fe | Santa Fe | $500,000 |
VALENCIA HIGH SCHL BLEACHERS | $100,000 | ($400,000) | Los Lunas PSD | Valencia | $500,000 |
WAGON MOUND SENIOR CENTER CONSTRUCT | $118,500 | ($381,500) | Wagon Mound | Mora | $500,000 |
BERN CO TRANSITIONAL LIVING & RECOVERY CTR | $370,000 | ($380,000) | Albuquerque | Bernalillo | $750,000 |
ASPEN CMTY MAGNET SCHL ATHLETIC FIELD | $30,000 | ($370,000) | Santa Fe PSD | Santa Fe | $400,000 |
COCHITI PUEBLO CULTURAL & LANGUAGE FCLTIES | $125,000 | ($368,465) | Cochiti Pueblo | Sandoval | $493,465 |
CHILILI LAND GRANT FIRE DEPARTMENT BUILDING | $120,000 | ($363,596) | Chilili Land Grant | Multiple Co | $483,596 |
LOS RANCHOS DE ALB AGRI-NATURE CTR BLDG & GROUNDS | $140,000 | ($360,000) | Los Ranchos de Albuquerque | Bernalillo | $500,000 |
UNM STADIUM LIGHTS | $40,000 | ($360,000) | Albuquerque | Bernalillo | $400,000 |
NOR-LEA SPECIAL HOSPITAL DIST THERAPY POOL | $145,000 | ($355,000) | Lovington | Lea | $500,000 |
ALB VISTA DEL NORTE PARK PHASE 3 IMPROVE | $145,000 | ($355,000) | Albuquerque | Bernalillo | $500,000 |
ALB ALAMEDA LITTLE LEAGUE PARK IMPROVE | $100,000 | ($350,070) | Albuquerque | Bernalillo | $450,070 |
CHICHILTAH CHP WASTEWATER LAGOON SYS | $150,000 | ($350,000) | Chichiltah Chapter | McKinley | $500,000 |
SAN MIGUEL CO ROADS & BRIDGES IMPROVE | $160,000 | ($340,000) | Las Vegas | San Miguel | $500,000 |
HOBSON RD IMPROVE MENOMINEE/US 285 - CHAVES CO | $167,428 | ($332,572) | Chaves | $500,000 | |
GALLUP INDIAN HILLS PK POWER & LIGHTING IMPROVE | $50,000 | ($329,000) | Gallup | McKinley | $379,000 |
ALCALDE MDWC & MSWA WELL PUMP HOUSE & TRTMNT SYS | $50,000 | ($328,000) | Alcalde | Rio Arriba | $378,000 |
EDGEWOOD WASTEWATER SYSTEM | $360,000 | ($327,000) | Edgewood | Santa Fe | $687,000 |
ANTHONY PARK/FARMERS' MARKET/RECREATION CENTER | $180,000 | ($320,000) | Anthony | Dona Ana | $500,000 |
MILAN MIRABAL PK MLTPRPS FLOOD CONTROL FCLTY | $80,000 | ($320,000) | Milan | Cibola | $400,000 |
SEVEN-BAR ELEM SCHL PARKING LOT IMPROVE | $25,000 | ($318,000) | Albuquerque PSD | Bernalillo | $343,000 |
SOUTH VALLEY PREPARATORY SCHL CONSTRUCT | $85,000 | ($315,000) | Albuquerque | Bernalillo | $400,000 |
MCKINLEY MID SCHL LANDSCAPING | $40,000 | ($312,000) | Albuquerque PSD | Bernalillo | $352,000 |
ALAMOGORDO GRIGGS FIELD DETENTION BASIN | $589,000 | ($311,000) | Alamogordo | Otero | $900,000 |
CARBON COAL ROAD IMPROVE MCKINLEY CO | $66,000 | ($309,000) | Gamerco | McKinley | $375,000 |
WNMU EMERGENCY TELEPHONE POLES | $195,000 | ($305,000) | Silver City | Grant | $500,000 |
CAMINO REAL REG UTIL AUTH LIFT STATIONS | $200,000 | ($300,000) | Dona Ana | $500,000 | |
HOBBS WASTEWATER RECLAMATION FCLTY IMPROVE | $100,000 | ($300,000) | Hobbs | Lea | $400,000 |
5TH STREET IMPROVEMENTS LORDSBURG | $200,000 | ($300,000) | Lordsburg | Hidalgo | $500,000 |
LOS LUNAS MID SCHL GYM | $100,000 | ($300,000) | Los Lunas PSD | Valencia | $400,000 |
LORDSBURG POLICE VEHICLES | $100,000 | ($300,000) | Lordsburg | Hidalgo | $400,000 |
ELEPHANT BUTTE WASTEWATER COLLECTION LINES | $200,000 | ($300,000) | Elephant Butte | Sierra | $500,000 |
LOS PINOS ROAD WATER CROSSING - LA CIENEGA | $100,000 | ($300,000) | Santa Fe | $400,000 | |
SANTA FE CO CHIMAYO FIRE STATION ADDITION | $100,000 | ($300,000) | Chimayo | Santa Fe | $400,000 |
GRANTS GEORGE HANOSH BRIDGE CONSTRUCT | $221,000 | ($299,000) | Grants | Cibola | $520,000 |
PLACITAS WATER WELL & TANKS | $100,000 | ($295,000) | Placitas | Sandoval | $395,000 |
SANDOVAL CO SHERIFF'S DEPARTMENT VEHICLES | $195,000 | ($291,000) | Bernalillo | Sandoval | $486,000 |
SANTA FE MUSEUM HILL CAMPUS | $60,000 | ($290,000) | Santa Fe | Santa Fe | $350,000 |
ATRISCO HERITAGE HIGH SCHL SHADE STRUCTURES | $40,000 | ($281,000) | Albuquerque PSD | Bernalillo | $321,000 |
SPRINGER WASTEWATER TREATMENT PLANT | $20,000 | ($280,000) | Springer | Colfax | $300,000 |
NMMI STOOPS/WALKWAYS HAGERMAN & SAUNDERS BARRA | $220,000 | ($280,000) | Roswell | Chaves | $500,000 |
PECOS SEWER LINE CONSTRUCT | $98,000 | ($278,365) | Pecos | San Miguel | $376,365 |
LOVING SEWER COLLECTION SYS IMPROVE | $90,000 | ($276,243) | Loving | Eddy | $366,243 |
PORTALES FIRE & WATER SYS IMPROVE | $170,000 | ($276,000) | Portales | Roosevelt | $446,000 |
CORRALES MUNICIPAL FACILITIES | $75,000 | ($275,000) | Corrales | Sandoval | $350,000 |
COMANCHE ELEM SCHL PLAYGROUND IMPROVE | $50,000 | ($275,000) | Albuquerque PSD | Bernalillo | $325,000 |
QUAIL RUN RD/QUAIL RUN CT/COVEY CT IMPROVE BERN CO | $100,000 | ($275,000) | Bernalillo | $375,000 | |
MORIARTY VETERAN'S MEMORIAL CONSTRUCT | $25,000 | ($265,000) | Moriarty | Torrance | $290,000 |
NAMBE PUEBLO WATER & WASTEWATER SYSTEM IMPROVE | $235,000 | ($265,000) | Nambe Pueblo | Santa Fe | $500,000 |
LOS LUNAS SPORTS COMPLEX CONSTRUCT | $220,000 | ($255,000) | Los Lunas | Valencia | $475,000 |
SOUTH VALLEY ACADEMY CHARTER SCHL ALB SOLAR PANEL | $46,250 | ($253,750) | Albuquerque PSD | Bernalillo | $300,000 |
SFCC PLANT OPERATIONS & MAINTENANCE IMPROVE | $50,000 | ($250,000) | Santa Fe | $300,000 | |
ALB LOW-INCOME COMMUNITY HEALTH FACILITY | $30,000 | ($250,000) | Albuquerque | Bernalillo | $280,000 |
CARLSBAD HISTORIC CAVERN THEATER RENOVATE | $250,000 | ($250,000) | Carlsbad | Eddy | $500,000 |
ALB KIRTLAND DOG PARK IMPROVE | $85,000 | ($245,000) | Albuquerque | Bernalillo | $330,000 |
CLEVELAND MID SCHL TRACK AREAS | $100,000 | ($245,000) | Albuquerque PSD | Bernalillo | $345,000 |
ENMU STADIUM CONSTRUCT | $256,000 | ($244,000) | Portales | Roosevelt | $500,000 |
GALLUP SKATE BOARD PARK CONSTRUCT | $195,000 | ($243,280) | Gallup | McKinley | $438,280 |
ELDORADO AREA WSD WELLS 2A & 2B IMPROVE | $115,000 | ($243,000) | Eldorado at Santa Fe | Santa Fe | $358,000 |
PAJARITO ELEM SCHL TRACK AREAS | $40,000 | ($240,000) | Albuquerque PSD | Bernalillo | $280,000 |
CERRO DE GUADALUPE ACEQUIA ASSOCIATION IMPROVE | $15,000 | ($235,000) | Cerro | Taos | $250,000 |
ELIDA SERVICE CONNECTIONS/FIRE HYDRANTS/METERS | $50,000 | ($235,000) | Elida | Roosevelt | $285,000 |
LAS CRUCES ROW/ROADS/FLOOD CONTROL | $766,000 | ($234,000) | Las Cruces | Dona Ana | $1,000,000 |
ALB BALDUINI PARK BATHRM | $10,000 | ($230,000) | Albuquerque | Bernalillo | $240,000 |
WEST LAS VEGAS PSD HEAD START INFO TECH | $35,278 | ($227,722) | West Las Vegas PSD | San Miguel | $263,000 |
ISLETA PUEBLO TRASH TRUCKS | $265,000 | ($227,000) | Isleta Pueblo | Multiple Co | $492,000 |
LOS ALAMOS CO FIBER PATHWAY | $275,000 | ($225,000) | Multiple Co | $500,000 | |
RUDOLFO ANAYA ELEM SCHL TRACK AREAS | $70,000 | ($225,000) | Albuquerque PSD | Bernalillo | $295,000 |
MARK TWAIN ELEM SCHL PARKING LOT IMPROVE | $55,945 | ($221,055) | Albuquerque PSD | Bernalillo | $277,000 |
SOUTH VALLEY COMMONS INFRASTRUCTURE/UTILITIES | $380,000 | ($220,000) | Albuquerque | Bernalillo | $600,000 |
ACEQUIA MADRE DE LAS VEGAS IMPROVE | $30,000 | ($220,000) | San Miguel | $250,000 | |
HUERFANO CHP WATER LINE CONSTRUCT BISTI AREA | $40,000 | ($220,000) | Huerfano Chapter | San Juan | $260,000 |
ROY WATER SYS IMPROVE | $20,000 | ($220,000) | Roy | Harding | $240,000 |
ZUNI PUEBLO WWATER TREATMENT CELL | $80,000 | ($220,000) | Zuni Pueblo | McKinley | $300,000 |
ENTERPRISE RD/GREFCO RD & DETENTION CTR-SOCORRO C | $185,000 | ($219,000) | Socorro | Socorro | $404,000 |
JAL LITTLE LEAGUE BASEBALL COMPLEX | $185,000 | ($215,000) | Jal | Lea | $400,000 |
7TH ST PHASE 1A IMPROVE - CLOVIS | $285,000 | ($215,000) | Clovis | Curry | $500,000 |
CAPITAN SCADA WATER SYS INSTALL | $25,000 | ($213,000) | Capitan | Lincoln | $238,000 |
BAAHAALI CHP ROAD CONSTRUCT | $90,000 | ($210,000) | Baahaali Chapter | McKinley | $300,000 |
TSA-YA-TOH CHP POWERLINE EXTENSION & WIRING | $110,000 | ($207,669) | Tsa-Ya-Toh Chapter | McKinley | $317,669 |
DOLORES GONZALES ELEM SCHL MINI FIELDS | $50,000 | ($207,000) | Albuquerque PSD | Bernalillo | $257,000 |
SANDIA PUEBLO PUBLIC WORKS EQUIP & STREET SWEEPER | $43,000 | ($207,000) | Sandia Pueblo | Sandoval | $250,000 |
ATRISCO HERITAGE ACADEMY HIGH SCHL ACCESS ROAD | $295,000 | ($205,000) | Albuquerque | Bernalillo | $500,000 |
GOVERNOR BENT ELEM SCHL SHADE STRUCTURES | $75,000 | ($202,000) | Albuquerque PSD | Bernalillo | $277,000 |
ARTESIA PSD SCHOOLS FIRE ALARM SYS | $300,000 | ($200,000) | Artesia PSD | Eddy | $500,000 |
ROSWELL ROADS IMPROVE | $300,000 | ($200,000) | Roswell | Chaves | $500,000 |
LOWER RIO GRANDE PWWA INFO TECH | $37,500 | ($200,000) | Dona Ana | $237,500 | |
AGUA FRIA WATER SYSTEM CONSTRUCT | $100,000 | ($200,000) | Santa Fe | $300,000 | |
TORTUGAS SIDEWALKS/CURBS/GUTTERS DONA ANA CO | $200,000 | ($200,000) | Tortugas | Dona Ana | $400,000 |
TWIN LAKES CHP WAREHOUSE CONSTRUCT | $50,000 | ($200,000) | Twin Lakes Chapter | McKinley | $250,000 |
NAGEEZI CHP ELECTRIC POWER LINE EXTENSION | $90,000 | ($199,677) | Nageezi Chapter | San Juan | $289,677 |
ALB ZIA LITTLE LEAGUE PARK IMPROVE | $121,200 | ($198,800) | Albuquerque | Bernalillo | $320,000 |
ALICE KING COMMUNITY SCHOOL INFO TECH | $60,000 | ($190,000) | Albuquerque PSD | Bernalillo | $250,000 |
RAMAH CHP SOLID WASTE TRANSFER STATION | $165,000 | ($185,000) | Ramah Chapter | Cibola | $350,000 |
H. HUMPHREY ELEM SCHL PLAYGROUND IMPROVE | $20,000 | ($183,000) | Albuquerque PSD | Bernalillo | $203,000 |
LAS VEGAS FIRE STATION MUSEUM | $20,000 | ($180,000) | Las Vegas | San Miguel | $200,000 |
SANTA FE CO LA TIERRA ROADS IMPROVE | $95,000 | ($180,000) | Santa Fe | $275,000 | |
SHONDEEN DRIVE IMPROVE - ROCK SPRINGS CHP | $120,000 | ($180,000) | Rock Springs Chapter | McKinley | $300,000 |
PARADISE BLVD/LA PAZ DR TRAFFIC SIGNAL | $150,000 | ($180,000) | Albuquerque | Bernalillo | $330,000 |
VALENCIA CO ROAD IMPROVEMENTS | $125,000 | ($175,000) | Valencia | $300,000 | |
DONA ANA CO DEL CERRO PARK IMPROVE | $100,000 | ($175,000) | Dona Ana | $275,000 | |
GRANT CO ROAD DEPARTMENT CHIP SPREADER | $100,000 | ($175,000) | Grant | $275,000 | |
3RD JUDICIAL DISTRICT COURT BUILDING ROOF | $78,500 | ($171,500) | Dona Ana | $250,000 | |
DE BACA CO ROADS CONSTRUCT | $150,000 | ($170,000) | Fort Sumner | De Baca | $320,000 |
WEST LAS VEGAS PSD SECURITY SYSTEMS | $30,000 | ($170,000) | West Las Vegas PSD | San Miguel | $200,000 |
CLOUDCROFT WATER TREATMENT/RECYCLING FACILITY | $582,000 | ($168,000) | Cloudcroft | Otero | $750,000 |
LA UNION MDS & WA EQUIPMENT | $75,000 | ($166,560) | La Union | Dona Ana | $241,560 |
ALB BERN CO WUA DON RESERVOIR PUMP STATION | $10,000 | ($165,000) | Bernalillo | $175,000 | |
ALB VILLELLA PARK IMPROVE | $5,000 | ($163,000) | Albuquerque | Bernalillo | $168,000 |
ZUNI PUEBLO BACKUP GENERATOR | $190,000 | ($162,000) | Zuni Pueblo | McKinley | $352,000 |
LOVING ELEM SCHL FOOD SERVICE AREA | $200,000 | ($161,000) | Loving MSD | Eddy | $361,000 |
ALB TAYLOR RANCH LIBRARY HVAC & ROOF | $25,000 | ($157,000) | Albuquerque | Bernalillo | $182,000 |
NM ACEQUIA COMMISSION STATEWIDE IMPROVE | $94,000 | ($156,000) | Statewide | $250,000 | |
VAUGHN SOLID WASTE PICKUP VEHICLE | $24,000 | ($156,000) | Vaughn | Guadalupe | $180,000 |
RATON STREETS IMPROVE | $150,000 | ($150,000) | Raton | Colfax | $300,000 |
CHAPARRAL DOLORES WRIGHT SKATE PARK DONA ANA CO | $125,000 | ($150,000) | Chaparral | Dona Ana | $275,000 |
EL PRADO WSD FACILITIES/WATER SYSTEMS IMPROVE | $50,000 | ($150,000) | El Prado | Taos | $200,000 |
SANTO DOMINGO PUEBLO ROAD GRADER PRCHS | $70,000 | ($150,000) | Santo Domingo Pueblo | Sandoval | $220,000 |
TOHATCHI CHP POWERLINE EXTENSIONS | $50,000 | ($150,000) | Tohatchi Chapter | McKinley | $200,000 |
SWEETWATER/BURNT CORN RDS ROUNDABOUT IYANBITO C | $50,000 | ($150,000) | Iyanbito Chapter | McKinley | $200,000 |
RUIDOSO CONVENTION CENTER IMPROVE | $154,200 | ($145,800) | Ruidoso | Lincoln | $300,000 |
ANTHONY SOLID WASTE TRUCKS | $80,000 | ($145,000) | Anthony | Dona Ana | $225,000 |
NMSU WEIGHT TRAINING FACILITY SPRINKLER SYSTEM | $100,000 | ($144,655) | Las Cruces | Dona Ana | $244,655 |
ACEQUIA DE LLANO SAN JUAN DE NEPOMUCENO PIPELINE | $40,000 | ($137,647) | Taos | $177,647 | |
MANZANO MESA ELEM SCHL MINI FIELDS | $35,000 | ($137,000) | Albuquerque PSD | Bernalillo | $172,000 |
SANTA FE CTR FOR CONTEMPORARY ARTS IMPROVE | $111,000 | ($135,120) | Santa Fe | Santa Fe | $246,120 |
ALB ROADRUNNER LITTLE LEAGUE BASEBALL FIELDS | $165,000 | ($135,000) | Albuquerque | Bernalillo | $300,000 |
EDGEWOOD ROAD MAINT WATER TRUCK | $50,000 | ($135,000) | Edgewood | Santa Fe | $185,000 |
ACOMA PUEBLO WASTEWATER TREATMENT FCLTY | $235,000 | ($133,350) | Acoma Pueblo | Cibola | $368,350 |
BOSQUE FARMS SENIOR MEAL SITE-MEALS EQUIP | $5,000 | ($133,150) | Bosque Farms | Valencia | $138,150 |
ATRISCO LAND GRANT FCLTY PURCHASE | $70,000 | ($130,000) | Atrisco Land Grant | Bernalillo | $200,000 |
ALB DALE BELLAMAH PARK CONSTRUCT | $120,000 | ($130,000) | Albuquerque | Bernalillo | $250,000 |
MCKINLEY CO ROAD 16 CONSTRUCT | $70,000 | ($130,000) | Church Rock Chapter | McKinley | $200,000 |
UNM STADIUM IMPROVE & SOUND SYSTEM | $30,000 | ($130,000) | Albuquerque | Bernalillo | $160,000 |
SANTA FE CO FIRE STATION - MADRID | $122,000 | ($128,000) | Madrid | Santa Fe | $250,000 |
ASK ACADEMY CHARTER SCHL REN & IMPROVE | $40,000 | ($127,000) | Rio Rancho | Sandoval | $167,000 |
OTERO CO CHAPARRAL COMMUNITY CTR KITCHEN | $94,600 | ($125,000) | Chaparral | Dona Ana | $219,600 |
RED ROCK CHP SENIOR CENTER CONSTRUCT | $75,000 | ($125,000) | Red Rock Chapter | McKinley | $200,000 |
TAYLOR-BARELA-REYNOLDS-MESILLA SITE IMPROVE | $25,000 | ($125,000) | Mesilla | Dona Ana | $150,000 |
TORREON-STAR LAKE CHP ARTS & CRAFTS FCLTY | $75,000 | ($125,000) | Torreon-Star Lake Chapter | Multiple Co | $200,000 |
ALB ALAMOSA SKATE PARK IMPROVE | $75,000 | ($125,000) | Albuquerque | Bernalillo | $200,000 |
NINA OTERO COMM SCHL FRAGILE EQUIP SANTA FE PSD | $10,800 | ($124,200) | Santa Fe PSD | Santa Fe | $135,000 |
LCC VEHICLES | $45,000 | ($122,868) | Las Vegas | San Miguel | $167,868 |
NM MUSEUM OF NATURAL HISTORY & SCIENCE IMPROVE | $277,500 | ($122,500) | Albuquerque | Bernalillo | $400,000 |
LAS VEGAS CITY PSD BUS PURCHASE | $30,000 | ($120,000) | Las Vegas City PSD | San Miguel | $150,000 |
SANTA FE HOMEBOUND MEALS PROGRAM FACILITY | $230,000 | ($120,000) | Santa Fe | Santa Fe | $350,000 |
SCHOOL ON WHEELS GROUNDS RENOVATE | $25,000 | ($120,000) | Albuquerque PSD | Bernalillo | $145,000 |
CARLSBAD INTERMEDIATE SCHL INFO TECH | $50,000 | ($115,000) | Carlsbad MSD | Eddy | $165,000 |
MCKINLEY CO BRIDGES IMPROVE | $85,000 | ($115,000) | McKinley | $200,000 | |
ELIDA MSD BUS PURCHASE | $54,000 | ($115,000) | Elida MSD | Roosevelt | $169,000 |
WILLARD WELL/WATER SYS IMPROVE | $60,000 | ($115,000) | Willard | Torrance | $175,000 |
ISLETA PUEBLO VETERAN'S ASSOCIATION BLDG IMPROVE | $90,000 | ($110,000) | Isleta Pueblo | Valencia | $200,000 |
TULAROSA ANIMAL SHELTER IMPROVE | $75,000 | ($110,000) | Tularosa | Otero | $185,000 |
SOCORRO RODEO & SOCCER FACILITY CONSTRUCT | $290,000 | ($110,000) | Socorro | Socorro | $400,000 |
MORA COMMUNITY THEATER | $45,000 | ($108,000) | Mora | Mora | $153,000 |
DORA CSD BUS PURCHASE | $50,000 | ($108,000) | Dora CSD | Roosevelt | $158,000 |
MADISON MID SCHL TRACK AREAS | $45,000 | ($108,000) | Albuquerque PSD | Bernalillo | $153,000 |
PORTALES LOADER PRCHS | $100,000 | ($105,000) | Portales | Roosevelt | $205,000 |
CORONADO SWCD RESERVOIRS IMPROVE | $50,000 | ($104,415) | Coronado SWCD | Sandoval | $154,415 |
AMY BIEHL HIGH SCHL ELEVATOR REPLACE | $37,250 | ($102,750) | Albuquerque | Bernalillo | $140,000 |
TAOS PUEBLO DPS WEAPONS & EQUIP | $20,000 | ($102,370) | Taos Pueblo | Taos | $122,370 |
BERN CO DEVELOPMENT CTR VEHICLES/EQUIP/INFO TECH | $145,000 | ($102,000) | Albuquerque | Bernalillo | $247,000 |
SOMBRA DEL MONTE ELEM SCHL SHADE STRUCTURES | $20,000 | ($101,000) | Albuquerque PSD | Bernalillo | $121,000 |
BERN CO FIRE DEPARTMENT FIRE ENGINE | $500,000 | ($100,000) | Bernalillo | $600,000 | |
ROBERTSON HIGH SCHL BAND INSTRUMENTS | $5,000 | ($100,000) | Las Vegas City PSD | San Miguel | $105,000 |
MEDIA ARTS COLLABORATIVE CHARTER SCHL BLDG | $60,000 | ($100,000) | Albuquerque | Bernalillo | $160,000 |
BAYARD RECREATION IMPROVEMENTS | $100,000 | ($100,000) | Bayard | Grant | $200,000 |
OLD CHURCH ROCK MINE RD CROSSINGS | $100,000 | ($100,000) | Pinedale Chapter | McKinley | $200,000 |
ANTHONY SIDEWALKS & ROADS IMPROVE | $200,000 | ($100,000) | Anthony | Dona Ana | $300,000 |
EAGLE NEST ENCHANTED CIRCLE GATEWAY MUSEUM | $85,000 | ($100,000) | Eagle Nest | Colfax | $185,000 |
TULAROSA COMMUNITY DITCH ASSOCIATION PIPELINE | $150,000 | ($100,000) | Tularosa | Otero | $250,000 |
SAN MIGUEL CO DETENTION CTR KITCHEN/LAUNDRY/SHOWE | $10,000 | ($97,700) | Las Vegas | San Miguel | $107,700 |
APACHE ELEM SCHL SHADE STRUCTURES | $20,000 | ($96,000) | Albuquerque PSD | Bernalillo | $116,000 |
BEL-AIR ELEM SCHL LANDSCAPING | $15,000 | ($96,000) | Albuquerque PSD | Bernalillo | $111,000 |
ALB EASTDALE LITTLE LEAGUE BASEBALL FIELDS IMPROVE | $155,000 | ($95,000) | Albuquerque | Bernalillo | $250,000 |
MORA CO AMBULANCE PURCHASE | $50,000 | ($95,000) | Mora | Mora | $145,000 |
DONA ANA CO INTRNATL JETPORT RUNWAY 10-28 IMPROVE | $255,000 | ($95,000) | Dona Ana | $350,000 | |
COLLEGE & CAREER HIGH SCHL INFO TECH | $6,250 | ($93,750) | Albuquerque PSD | Bernalillo | $100,000 |
LAS VEGAS POLICE VEHICLES | $108,000 | ($92,000) | Las Vegas | San Miguel | $200,000 |
RIO RANCHO POLICE DEPT VEHICLES | $308,500 | ($91,500) | Rio Rancho | Sandoval | $400,000 |
LOS RANCHOS ELEM SCHL PLAYGROUND IMPROVE | $40,000 | ($91,000) | Albuquerque PSD | Bernalillo | $131,000 |
CLOVIS BUSINESS ENTERPRISE CENTER IMPROVE | $60,000 | ($90,000) | Clovis | Curry | $150,000 |
LA PROMESA EARLY LEARNING CTR CONSTRUCT | $60,000 | ($90,000) | Albuquerque | Bernalillo | $150,000 |
TAJIQUE LAND GRANT COMMUNITY CTR | $10,000 | ($90,000) | Torrance | $100,000 | |
NMHU ATHLETICS DEPARTMENT | $111,000 | ($89,000) | Las Vegas | San Miguel | $200,000 |
HIGHLAND HIGH SCHL SECURITY SYSTEMS | $77,945 | ($88,055) | Albuquerque PSD | Bernalillo | $166,000 |
MORA CO SHERIFF'S DEPARTMENT VEHICLES | $25,000 | ($86,735) | Mora | $111,735 | |
BELEN VIVIAN FIELDS IMPROVE | $415,000 | ($85,000) | Belen | Valencia | $500,000 |
DONA ANA CO MESQUITE PARK IMPROVE | $190,000 | ($85,000) | Mesquite | Dona Ana | $275,000 |
EL CRESTON MDWCA WATER SYSTEM IMPROVE | $65,000 | ($85,000) | Las Vegas | San Miguel | $150,000 |
SAN MIGUEL CO SHERIFF'S DEPARTMENT VEHICLES | $20,000 | ($84,000) | Las Vegas | San Miguel | $104,000 |
LITTLE WATER CHP POWER LINE EXTEND | $90,000 | ($83,250) | Little Water Chapter | McKinley | $173,250 |
SOUTH VALLEY MEDIA INFO TECH & EQUIP BERN CO | $5,000 | ($83,105) | Bernalillo | $88,105 | |
PALACE OF THE GOVERNORS IMPROVE | $417,175 | ($82,825) | Santa Fe | Santa Fe | $500,000 |
ENMU-ROSWELL PHYSICAL PLANT DEPT TRUCKS PRCHS | $30,000 | ($81,520) | Roswell | Chaves | $111,520 |
OJO ENCINO CHP EAGLE SPRING POWERLINE | $40,000 | ($80,627) | Ojo Encino Chapter | Multiple Co | $120,627 |
PETROGLYPH ELEM SCHL INFO TECH | $20,000 | ($80,000) | Albuquerque PSD | Bernalillo | $100,000 |
TAOS CO AMALIA COMMUNITY CENTER | $20,000 | ($80,000) | Amalia | Taos | $100,000 |
WEST LAS VEGAS PSD SPECIAL OLYMPICS PROGRAM BUS | $55,000 | ($80,000) | West Las Vegas PSD | San Miguel | $135,000 |
ACEQUIA DEL MONTE DEL RIO CHIQUITO DAM IMPROVE | $20,000 | ($80,000) | Ranchos de Taos | Taos | $100,000 |
COBRE CSD ACTIVITY BUS PRCHS EQUIP | $150,000 | ($80,000) | Cobre CSD | Grant | $230,000 |
DEL NORTE HGH SCHL FINE ARTS FACILITIES | $50,000 | ($80,000) | Albuquerque PSD | Bernalillo | $130,000 |
EAST SAN JOSE ELEM SCHL SECURITY SYSTEMS | $20,000 | ($80,000) | Albuquerque PSD | Bernalillo | $100,000 |
MOSQUERO ROADS IMPROVE | $20,000 | ($80,000) | Mosquero | Harding | $100,000 |
SANTA ROSA ILFELD WAREHOUSE RENOVATE | $120,000 | ($80,000) | Santa Rosa | Guadalupe | $200,000 |
ALB ALTERNATIVE RESPONSE STATION | $35,000 | ($80,000) | Albuquerque | Bernalillo | $115,000 |
UNM HEALTH PROFESSIONALS PIPELINE PURCHASE | $70,500 | ($79,500) | Albuquerque | Bernalillo | $150,000 |
WNMU W 12TH ST PROPERTY ACQUIRE | $85,000 | ($78,810) | Silver City | Grant | $163,810 |
SAHQ CONSTRUCT & EQUIP | $21,250 | ($78,750) | Albuquerque | Bernalillo | $100,000 |
AMY BIEHL HIGH SCHL ASBESTOS ABATEMENT | $22,000 | ($78,000) | Albuquerque | Bernalillo | $100,000 |
INEZ ELEM SCHL PLAYGROUND IMPROVE | $65,000 | ($78,000) | Albuquerque PSD | Bernalillo | $143,000 |
ALB MCKINLEY COMMUNITY CTR EXPANSION | $25,000 | ($75,000) | Albuquerque | Bernalillo | $100,000 |
CAPITAN DEPOT MUSEUM IMPROVE | $25,000 | ($75,000) | Capitan | Lincoln | $100,000 |
JICARILLA APACHE COMMUNICATIONS TOWER | $105,000 | ($75,000) | Rio Arriba | $180,000 | |
COYOTE CANYON CHP REHAB CTR RENOVATE | $85,000 | ($75,000) | Coyote Canyon Chapter | McKinley | $160,000 |
ERNIE PYLE MID SCHL SECURITY | $25,000 | ($75,000) | Albuquerque PSD | Bernalillo | $100,000 |
TO'HAJIILEE CHP SKATEBOARD & REC PARK | $75,000 | ($75,000) | To'hajiilee Chapter | Bernalillo | $150,000 |
FLORIDA ST MULTIUSE PATH CONSTRUCT DEMING | $150,000 | ($75,000) | Deming | Luna | $225,000 |
PAINTED SKY ELEM SCHL PLAYGROUND IMPROVE | $75,000 | ($75,000) | Albuquerque PSD | Bernalillo | $150,000 |
RED RIVER STREET SWEEPER PURCHASE | $125,000 | ($75,000) | Red River | Taos | $200,000 |
TAOS CO SHERIFF DEPARTMENT VEHICLES | $25,000 | ($75,000) | Taos | $100,000 | |
SILVER CITY SIDEWALKS | $125,000 | ($75,000) | Silver City | Grant | $200,000 |
LOWELL ELEM SCHL SHADE STRUCTURES | $10,000 | ($74,000) | Albuquerque PSD | Bernalillo | $84,000 |
VAUGHN MSD BUS | $27,000 | ($73,000) | Vaughn MSD | Guadalupe | $100,000 |
PICURIS SENIOR CENTER-IMPROVE CODE | $20,000 | ($72,850) | Picuris Pueblo | Taos | $92,850 |
BELLEHAVEN ELEM SCHL PLAYGROUND IMPROVE | $100,000 | ($72,000) | Albuquerque PSD | Bernalillo | $172,000 |
TAOS ANIMAL SHELTER | $79,000 | ($71,000) | Taos | Taos | $150,000 |
CARLSBAD HALAGUENO ARTS PARK PHASE 3 | $10,000 | ($70,000) | Carlsbad | Eddy | $80,000 |
UNM BASKETBALL FCLTY COMM IMPROVE | $531,000 | ($69,000) | Albuquerque | Bernalillo | $600,000 |
TUCUMCARI WATER & SEWER LINES REPLACE | $181,000 | ($69,000) | Tucumcari | Quay | $250,000 |
CHAROLAIS DR IMPROVE - DONA ANA CO | $50,000 | ($67,929) | Las Cruces | Dona Ana | $117,929 |
COLLET PARK ELEM SCHL SHADE STRUCTURES | $25,000 | ($67,000) | Albuquerque PSD | Bernalillo | $92,000 |
UNM SCHOOL OF LAW IMPROVE | $135,000 | ($65,000) | Albuquerque | Bernalillo | $200,000 |
GALLUP POLICE VEHICLES | $285,000 | ($65,000) | Gallup | McKinley | $350,000 |
ADOBE ACRES ELEM SCHL TRACK AREAS | $20,000 | ($65,000) | Albuquerque PSD | Bernalillo | $85,000 |
TRUTH OR CONSEQUENCES FEEDER/ELECTRICAL IMPROVE | $35,000 | ($65,000) | Truth or Consequences | Sierra | $100,000 |
ZUNI ELEM SCL PLAYGROUND IMPROVE | $115,000 | ($63,000) | Albuquerque PSD | Bernalillo | $178,000 |
BERN CO SHERIFF VEHICLES | $877,500 | ($62,500) | Bernalillo | $940,000 | |
BOSQUE FARMS COMMUNITY CTR KITCHEN | $5,000 | ($62,000) | Bosque Farms | Valencia | $67,000 |
CHAMA WATER TREATMENT POD | $106,000 | ($62,000) | Chama | Rio Arriba | $168,000 |
VALLEY HIGH SCHL PERFORMING ARTS FACILITIES | $95,000 | ($62,000) | Albuquerque PSD | Bernalillo | $157,000 |
ROOSEVELT CO SHERIFF'S OFFICE VEHICLES | $60,000 | ($60,000) | Roosevelt | $120,000 | |
BERNALILLO SPORTS FACILITIES | $40,000 | ($60,000) | Bernalillo | Sandoval | $100,000 |
SAN PEDRO DR LIGHTS/IMPROVE LOMAS/I-40 | $15,000 | ($60,000) | Albuquerque | Bernalillo | $75,000 |
ATRISCO ELEM SCHL SECURITY SYSTEMS | $25,000 | ($60,000) | Albuquerque PSD | Bernalillo | $85,000 |
LLANO QUEMADO MDWCA WATER SYS IMPROVE | $20,000 | ($60,000) | Taos | $80,000 | |
LOS PADILLAS ELEM SCHL SECURITY SYSTEMS | $30,000 | ($60,000) | Albuquerque PSD | Bernalillo | $90,000 |
NORTHWEST NM COUNCIL OF GOVERNMENTS BLDG PRCHS | $90,000 | ($60,000) | Gallup | McKinley | $150,000 |
MANZANO HIGH SCHL PERFORMING ARTS FACILITIES | $70,000 | ($57,000) | Albuquerque PSD | Bernalillo | $127,000 |
VIETNAM VETERANS MEMORIAL STATE PARK | $224,341 | ($55,659) | Colfax | $280,000 | |
EL CAMINO REAL ACADEMY ALB PSD IMPROVE | $45,000 | ($55,000) | Albuquerque PSD | Bernalillo | $100,000 |
MCKINLEY CO THOREAU MULTIPURPOSE DEVELOPMENT | $20,000 | ($55,000) | Thoreau | McKinley | $75,000 |
ALAMOGORDO FAMILY REC CTR LOCKER ROOMS | $245,000 | ($55,000) | Alamogordo | Otero | $300,000 |
UNM FOOTBALL & SOCCER STADIUM | $345,000 | ($55,000) | Albuquerque | Bernalillo | $400,000 |
ANTONIO LANE IMPROVE SANTA FE CO | $45,000 | ($55,000) | Santa Fe | $100,000 | |
CERRO REGIONAL MDWC & SWA WATER SYS IMPROVE | $45,000 | ($55,000) | Cerro | Taos | $100,000 |
ZIA PUEBLO CHILDHOOD DEVELOPMENT CTR PHASE 1 | $145,000 | ($55,000) | Zia Pueblo | Sandoval | $200,000 |
SSCAFCA SHERIFF'S POSSE RD ARROYO DIVERSION STRUC | $345,000 | ($55,000) | Rio Rancho | Sandoval | $400,000 |
VALENCIA CO ANIMAL SHELTER EXPAND | $97,000 | ($53,000) | Valencia | $150,000 | |
CIBOLA HIGH SCHL BASKETBALL/TENNIS COURT AREAS | $55,000 | ($51,000) | Albuquerque PSD | Bernalillo | $106,000 |
SANTA FE DANCE BARNS EQUIP | $78,000 | ($50,000) | Santa Fe | Santa Fe | $128,000 |
ALB LADERA MUNI GOLF COURSE DRIVING RANGE | $50,000 | ($50,000) | Albuquerque | Bernalillo | $100,000 |
NEWCOMB CHP VETERANS' MEMORIAL PARK | $25,000 | ($50,000) | Newcomb Chapter | San Juan | $75,000 |
RIO RANCHO CIBOLA SPORTS COMPLEX RENOVATE | $50,000 | ($50,000) | Rio Rancho | Sandoval | $100,000 |
SHIPROCK CHP STREET & TRAFFIC LIGHTS | $200,000 | ($50,000) | Shiprock Chapter | San Juan | $250,000 |
WHITEHORSE LAKE CHP POWER LINE EXTENSIONS | $50,000 | ($50,000) | Whitehorse Lake Chapter | McKinley | $100,000 |
AGUA PURA MDWC & MSWA WATER SYS IMPROVE MORA CO | $50,000 | ($50,000) | Chacon | Mora | $100,000 |
BAAHAALI CHP WATER WELL | $30,000 | ($50,000) | Baahaali Chapter | McKinley | $80,000 |
CATRON CO COURTHOUSE IMPROVE | $150,000 | ($50,000) | Reserve | Catron | $200,000 |
EL VALLE WATER ALLIANCE WATER SYSTEM IMPROVE | $50,000 | ($50,000) | San Miguel | San Miguel | $100,000 |
VALLECITOS MDWCA WATER SYSTEM | $50,000 | ($50,000) | Vallecitos | Rio Arriba | $100,000 |
LUNA CO ANNEX CONSTRUCT EQUIP | $150,000 | ($50,000) | Deming | Luna | $200,000 |
CIEN AGUAS INTERNATIONAL SCHL INFO TECH | $26,250 | ($48,750) | Albuquerque | Bernalillo | $75,000 |
LAS VEGAS CITY PSD VEHICLES PURCHASE | $45,000 | ($47,000) | Las Vegas City PSD | San Miguel | $92,000 |
VALENCIA SWCD MAINTENANCE BLDG ADD IMPROVE | $34,500 | ($45,625) | Belen | Valencia | $80,125 |
CHAVES CO SOLID WASTE CONVENIENCE CTRS COMPACTO | $90,910 | ($45,090) | Chaves | $136,000 | |
ROSWELL CITY HALL ANNEX BLDG | $105,000 | ($45,000) | Roswell | Chaves | $150,000 |
CHAPELLE MDCA WATER SYSTEM IMPROVE | $45,000 | ($45,000) | Serafina | San Miguel | $90,000 |
COCHITI ELEM SCHL SECURITY SYSTEMS | $47,000 | ($45,000) | Albuquerque PSD | Bernalillo | $92,000 |
ESTANCIA MSD SECURITY IMPROVE | $55,000 | ($45,000) | Estancia MSD | Torrance | $100,000 |
BERN CO ASIAN AMERICAN MONUMENT | $155,005 | ($44,995) | Albuquerque | Bernalillo | $200,000 |
BERINO AREA ROADS & DRAINAGE IMPROVE | $175,000 | ($44,602) | Berino | Dona Ana | $219,602 |
MOUNTAIN VIEW ELEM SCHL SECURITY SYSTEMS | $28,000 | ($44,000) | Albuquerque PSD | Bernalillo | $72,000 |
HOLLYWOOD RANCH DWUA EQUIP | $8,000 | ($42,000) | Santa Rosa | Guadalupe | $50,000 |
CAPITAN STREETS RSURF | $104,000 | ($41,000) | Capitan | Lincoln | $145,000 |
GUADALUPE CO SHERIFF'S OFFICE VEHICLES | $34,000 | ($41,000) | Guadalupe | $75,000 | |
BERNALILLO ECONOMIC DEVELOPMENT CAMPUS | $159,990 | ($40,010) | Bernalillo | Sandoval | $200,000 |
V. SUE CLEVELAND HIGH SCHL MAIN ENTRY | $100,000 | ($40,000) | Rio Rancho PSD | Sandoval | $140,000 |
RUIDOSO DOWNS HUBBARD MUSEUM IMPROVE | $230,000 | ($40,000) | Ruidoso Downs | Lincoln | $270,000 |
LAS VEGAS POLICE DEPT FIRING RANGE FCTY | $10,000 | ($40,000) | Las Vegas | San Miguel | $50,000 |
MORA CO SNOW REMOVAL VEHICLE | $100,000 | ($40,000) | Mora | $140,000 | |
RIO GRANDE BLVD BIKE LANES - ALB | $80,500 | ($39,500) | Albuquerque | Bernalillo | $120,000 |
LAGUNA PUEBLO SAFETY DEPT ROOF REPLACE | $225,000 | ($39,288) | Laguna Pueblo | Cibola | $264,288 |
ACEQUIA DE ATRAS DE LA PLAZA IMPROVE | $37,000 | ($38,143) | Espanola | Rio Arriba | $75,143 |
NAVAJO ELEM SCHL SHADE STRUCTURES | $10,000 | ($38,000) | Albuquerque PSD | Bernalillo | $48,000 |
4TH JUDICIAL DISTRICT SANTA ROSA SECURITY SYS | $8,000 | ($37,000) | Santa Rosa | Guadalupe | $45,000 |
MISSION AVENUE ELEM SCHL SHADE STRUCTURES | $20,000 | ($37,000) | Albuquerque PSD | Bernalillo | $57,000 |
MCKINLEY SWCD VEHICLE | $10,000 | ($35,500) | Gallup | McKinley | $45,500 |
DIGITAL ARTS & TECHNOLOGY ACADEMY IMPROVE | $40,000 | ($35,000) | Albuquerque PSD | Bernalillo | $75,000 |
ACEQUIA DE OJO SARCO EROSION STRUCTURES | $35,000 | ($35,000) | Ojo Sarco | Rio Arriba | $70,000 |
LA ACADEMIA DE ESPERANZA IMPROVE | $15,000 | ($35,000) | Albuquerque PSD | Bernalillo | $50,000 |
ALB TONY HILLERMAN LIBRARY PARKING LOT | $54,000 | ($34,000) | Albuquerque | Bernalillo | $88,000 |
BELLEHAVEN ELEM SCHL SECURITY SYSTEMS | $35,000 | ($34,000) | Albuquerque PSD | Bernalillo | $69,000 |
HARRISON MID SCHL LIBRARIES & BOOKROOMS | $25,000 | ($34,000) | Albuquerque PSD | Bernalillo | $59,000 |
EUGENE FIELD ELEM SCHL SECURITY SYSTEMS | $33,000 | ($33,000) | Albuquerque PSD | Bernalillo | $66,000 |
DULCE FIRE DEPT BREATHING APPARATUS | $32,035 | ($32,035) | Dulce | Rio Arriba | $64,070 |
4TH JUDICIAL DISTRICT FURNITURE | $8,000 | ($32,000) | Santa Rosa | Guadalupe | $40,000 |
HOOVER MID SCHL SECURITY SYSTEMS | $75,000 | ($32,000) | Albuquerque PSD | Bernalillo | $107,000 |
LONGFELLOW ELEM SCHL LIBRARIES & BOOKROOMS | $32,000 | ($32,000) | Albuquerque PSD | Bernalillo | $64,000 |
POLK MID SCHL SECURITY SYSTEMS | $20,000 | ($32,000) | Albuquerque PSD | Bernalillo | $52,000 |
MARIANO LAKE CHP MLTPRPS BLDG REN ADD | $120,000 | ($31,690) | Mariano Lake Chapter | McKinley | $151,690 |
ALB ALAMEDA PARK IMPROVE & EQUIP | $19,000 | ($31,000) | Albuquerque | Bernalillo | $50,000 |
CARRIZOZO TRUCK/TRAILER PRCHS & EQUIP | $120,000 | ($30,000) | Carrizozo | Lincoln | $150,000 |
UNM BASEBALL FACILITY IMPROVE | $175,000 | ($30,000) | Albuquerque | Bernalillo | $205,000 |
COTTONWOOD CLASSICAL PREP SCHL PH 1 MLTPRPS CTR | $130,000 | ($30,000) | Albuquerque | Bernalillo | $160,000 |
WEST CENTRAL AVE IMPROVE - ALB | $70,000 | ($30,000) | Albuquerque | Bernalillo | $100,000 |
CORONADO HISTORIC SITE RUINS FOOTPRINT | $70,000 | ($30,000) | Bernalillo | Sandoval | $100,000 |
BELEN VETERANS MEMORIAL | $70,000 | ($30,000) | Belen | Valencia | $100,000 |
EAST SANDOVAL ACEQUIA JEMEZ RIVER BASIN IMPROVE | $10,000 | ($30,000) | Jemez Springs | Sandoval | $40,000 |
TATUM REPAIRS | $20,000 | ($30,000) | Tatum | Lea | $50,000 |
ACEQUIA DE CHAMISAL Y OJITO EXCAVATOR | $10,000 | ($30,000) | Chamisal | Taos | $40,000 |
CHELWOOD ELEM SCHL LIBRARIES & BOOKROOMS | $20,000 | ($30,000) | Albuquerque PSD | Bernalillo | $50,000 |
EISENHOWER MID SCHL SECURITY SYSTEMS | $97,000 | ($30,000) | Albuquerque PSD | Bernalillo | $127,000 |
LEW WALLACE ELEM SCHL TABLES & BENCHES | $30,000 | ($30,000) | Albuquerque PSD | Bernalillo | $60,000 |
TSE'II'AHI CHP TRUCK & TRANSPORT TRAILER | $70,000 | ($30,000) | Tse'ii'ahi Chapter | McKinley | $100,000 |
MORIARTY HIGH SCHL AUTOMOTIVE FACILITIES | $20,000 | ($30,000) | Moriarty-Edgewood MSD | Multiple Co | $50,000 |
LOS RANCHOS ELEM SCHL SECURITY SYSTEMS | $10,000 | ($29,000) | Albuquerque PSD | Bernalillo | $39,000 |
BANDELIER ELEM SCHL SECURITY SYSTEMS | $55,945 | ($28,055) | Albuquerque PSD | Bernalillo | $84,000 |
ALB PSD JROTC PROGRAM EQUIP | $118,000 | ($28,000) | Albuquerque PSD | Bernalillo | $146,000 |
ACEQUIA DE LAS JOYAS IMPROVE | $15,000 | ($27,220) | Santa Fe | Santa Fe | $42,220 |
JEFFERSON MID SCHL SECURITY SYSTEMS | $60,945 | ($26,055) | Albuquerque PSD | Bernalillo | $87,000 |
UPPER FRUITLAND CHP SENIOR CTR | $124,000 | ($26,000) | Upper Fruitland Chapter | San Juan | $150,000 |
SFCC SCIENCE ON A SPHERE PURCHASE | $75,000 | ($25,000) | Santa Fe | $100,000 | |
SAN FELIPE PUEBLO BASEBALL FIELDS | $25,000 | ($25,000) | San Felipe Pueblo | Sandoval | $50,000 |
GRANT CO GILA RGNL MED CTR X-RAY MACHINE | $125,000 | ($25,000) | Silver City | Grant | $150,000 |
TECHNOLOGY LEADERSHIP HIGH SCHL EQUIP & FURNISH | $75,000 | ($25,000) | Albuquerque | Bernalillo | $100,000 |
INDIAN PUEBLO CULTURAL CTR PARKING LOT IMPROVE | $276,000 | ($24,000) | Albuquerque | Bernalillo | $300,000 |
WHITTIER ELEM SCHL SECURITY SYSTEMS | $50,945 | ($23,055) | Albuquerque PSD | Bernalillo | $74,000 |
1ST JUDICIAL DISTRICT COURT DOCKET DISPLAY SYSTEM | $67,200 | ($22,800) | Multiple Co | $90,000 | |
ACEQUIA DE ANTON CHICO IMPROVE | $10,000 | ($20,000) | Guadalupe | $30,000 | |
SANGRE DE CRISTO REGIONAL MDWC & MSWA WATER SYS | $10,000 | ($20,000) | Anton Chico | Guadalupe | $30,000 |
UNM RUGBY EQUIPMENT | $40,000 | ($20,000) | Albuquerque | Bernalillo | $60,000 |
ACEQUIA DEL ALTO AL NORTE IMPROVE | $10,000 | ($20,000) | Mora | Mora | $30,000 |
BERNALILLO PSD INDIAN EDUCATION RESOURCE CTR | $30,000 | ($20,000) | Bernalillo PSD | Sandoval | $50,000 |
TRAMPAS DWC & MSWA WATER SYS IMPROVE | $20,000 | ($20,000) | Chamisal | Taos | $40,000 |
ALAMOSA ELEM SCHL TRACK AREAS | $74,300 | ($19,700) | Albuquerque PSD | Bernalillo | $94,000 |
FORT SILL APACHE RESERVATION MONUMENTS | $131,000 | ($19,000) | Luna | $150,000 | |
PUEBLO PINTADO CHP POWER LINE EXTEND | $25,000 | ($18,330) | Pueblo Pintado Chapter | McKinley | $43,330 |
VALENCIA CO MEADOW LAKE COMMUNITY PARK | $30,000 | ($18,200) | Meadow Lake | Valencia | $48,200 |
EUBANK ELEM SCHL SECURITY SYSTEMS | $60,000 | ($18,000) | Albuquerque PSD | Bernalillo | $78,000 |
VALLE VISTA ELEM SCHL SECURITY SYSTEMS | $86,000 | ($18,000) | Albuquerque PSD | Bernalillo | $104,000 |
SANDIA PUEBLO SOLID WASTE TRANSFER STATION | $132,160 | ($17,840) | Sandia Pueblo | Sandoval | $150,000 |
FREEDOM HIGH SCHL SECURITY SYSTEMS | $15,000 | ($17,000) | Albuquerque PSD | Bernalillo | $32,000 |
MORNINGSIDE DR NE/AVENIDA DEL SOL NE IMPROVE | $5,000 | ($16,500) | Albuquerque | Bernalillo | $21,500 |
TAFT MID SCHL SECURITY SYSTEMS | $45,000 | ($16,000) | Albuquerque PSD | Bernalillo | $61,000 |
DONA ANA CO SOUTHERN NM FAIRGROUNDS IMPROVE | $235,000 | ($15,000) | Dona Ana | $250,000 | |
CORONA RED CLOUD WELL REPAIR | $10,000 | ($15,000) | Corona | Lincoln | $25,000 |
CARLSBAD MENTAL HEALTH FCLTY CONSTRUCT | $485,000 | ($15,000) | Carlsbad | Eddy | $500,000 |
LAS CRUCES THOMAS BRANIGAN MEMORIAL LIBRARY EQUIP | $40,000 | ($15,000) | Las Cruces | Dona Ana | $55,000 |
AMY BIEHL HIGH SCHL INFO TECH | $35,000 | ($15,000) | Albuquerque | Bernalillo | $50,000 |
ALB WESTGATE PARK IMPROVE | $75,000 | ($15,000) | Albuquerque | Bernalillo | $90,000 |
NUESTROS VALORES CHARTER SCHL IMPROVE | $60,000 | ($15,000) | Albuquerque PSD | Bernalillo | $75,000 |
RIO ARRIBA CO RURAL EVENTS CTR REN & EXPAND | $235,000 | ($15,000) | Abiquiu | Rio Arriba | $250,000 |
PENDARIES VILLAGE LANE/CR A34 IMPROVE | $5,000 | ($15,000) | San Miguel | $20,000 | |
ACEQUIA DEL MONTE DEL RIO CHIQUITO COMPUERTAS | $15,000 | ($15,000) | Ranchos de Taos | Taos | $30,000 |
ALB DUKE CITY BMX RACE TRACK SECURITY & INFO TECH | $10,000 | ($15,000) | Albuquerque | Bernalillo | $25,000 |
ENMU STUDENT INSTRUCTIONAL LABS INFO TECH | $135,000 | ($15,000) | Portales | Roosevelt | $150,000 |
BERN CO CIELO VISTA CIRCLE PARK CONSTRUCT | $60,000 | ($15,000) | Bernalillo | $75,000 | |
GRANT CO DRUG REHAB FCLTY CONSTRUCT | $186,000 | ($14,000) | Grant | $200,000 | |
ZIA ELEM SCHL LIBRARIES & BOOKROOMS | $55,945 | ($13,055) | Albuquerque PSD | Bernalillo | $69,000 |
NEW FUTURES HIGH SCHL LANDSCAPING | $20,000 | ($13,000) | Albuquerque PSD | Bernalillo | $33,000 |
ALB LOS GRIEGOS LIBRARY PARKING LOT | $54,000 | ($13,000) | Albuquerque | Bernalillo | $67,000 |
SANTA FE CHILDREN'S MUSEUM | $62,000 | ($12,600) | Santa Fe | Santa Fe | $74,600 |
AUTISM CENTER ALB PSD LANDSCAPING | $25,500 | ($12,500) | Albuquerque PSD | Bernalillo | $38,000 |
BERN CO FAMILY SVCS FACILITY/INFO TECH | $100,000 | ($12,000) | Albuquerque | Bernalillo | $112,000 |
ROSWELL AIR CENTER REPAIRS | $488,822 | ($11,178) | Roswell | Chaves | $500,000 |
SAN FELIPE PUEBLO SAN FRANCISCO ARROYO DAM | $90,000 | ($10,000) | San Felipe Pueblo | Sandoval | $100,000 |
VALENCIA CO SHERIFF'S OFFICE VEHICLES | $240,000 | ($10,000) | Los Lunas | Valencia | $250,000 |
GALLUP WRESTLING MAT | $10,000 | ($10,000) | Gallup | McKinley | $20,000 |
MANUELITO CHP ADMINISTRATIVE SERVICE CTR | $65,000 | ($10,000) | Manuelito Chapter | McKinley | $75,000 |
CUBA WATER SYSTEM IMPROVE | $70,000 | ($10,000) | Cuba | Sandoval | $80,000 |
GRIEGOS ELEM SCHL SHADE STRUCTURES | $75,000 | ($10,000) | Albuquerque PSD | Bernalillo | $85,000 |
MARY ANN BINFORD ELEM SCHL TRACK AREAS | $85,000 | ($10,000) | Albuquerque PSD | Bernalillo | $95,000 |
MITCHELL ELEM SCHL SHADE STRUCTURES | $30,000 | ($10,000) | Albuquerque PSD | Bernalillo | $40,000 |
MCC INFO TECH | $105,000 | ($10,000) | Tucumcari | Quay | $115,000 |
ELDORADO HIGH SCHL SECURITY SYSTEMS | $41,000 | ($9,000) | Albuquerque PSD | Bernalillo | $50,000 |
ONATE ELEM SCHL PLAYGROUND IMPROVE | $45,000 | ($8,000) | Albuquerque PSD | Bernalillo | $53,000 |
MONTESSORI ELEM SCHL BUS PURCHASE | $72,500 | ($7,500) | Albuquerque | Bernalillo | $80,000 |
ALB ALAMOSA PARK FENCE | $33,000 | ($7,000) | Albuquerque | Bernalillo | $40,000 |
HELEN CORDERO ELEM SCHL SHADE STRUCTURES | $75,000 | ($6,000) | Albuquerque PSD | Bernalillo | $81,000 |
CARLOS REY ELEM SCHL BASKETBALL/TENNIS COURT AREA | $40,000 | ($6,000) | Albuquerque PSD | Bernalillo | $46,000 |
UNM-TAOS HARWOOD MUSEUM RENOVATE | $95,000 | ($5,000) | Taos | Taos | $100,000 |
SFCC AUTO EQUIPMENT PURCHASE & INSTALL | $245,000 | ($5,000) | Santa Fe | Santa Fe | $250,000 |
EL DORADO COMMUNITY SCHL PERFORMANCE STAGE | $70,000 | ($5,000) | Santa Fe PSD | Santa Fe | $75,000 |
CHELWOOD ELEM SCHL BUILDING RENOVATE | $10,000 | ($5,000) | Albuquerque PSD | Bernalillo | $15,000 |
CORRALES VEHICLES PRCHS | $145,000 | ($5,000) | Corrales | Sandoval | $150,000 |
MISSION ACHIEVEMENT & SUCCESS CHARTER INFO TECH | $45,000 | ($5,000) | Albuquerque | Bernalillo | $50,000 |
MONTEZUMA ELEM SCHL LIBRARIES & BOOKROOMS | $10,000 | ($5,000) | Albuquerque PSD | Bernalillo | $15,000 |
REGINALD CHAVEZ ELEM SCHL TRACK AREAS | $34,000 | ($5,000) | Albuquerque PSD | Bernalillo | $39,000 |
WEST RIM MDWUA CARD READER METER SYSTEM | $25,000 | ($5,000) | Taos | $30,000 | |
MORIARTY HIGH SCHL FUTURE FARMERS/WELDING PROGRA | $25,000 | ($5,000) | Moriarty-Edgewood MSD | Multiple Co | $30,000 |
TIERRA ADENTRO CHARTER SCHL INFO TECH | $96,000 | ($4,000) | Albuquerque | Bernalillo | $100,000 |
TWO GREY HILLS CHP VETERANS' MEMORIAL PARK | $96,000 | ($4,000) | Two Grey Hills Chapter | San Juan | $100,000 |
MEDIA ARTS COLLABORATIVE CHARTER SCHL INFO TECH | $76,250 | ($3,750) | Albuquerque | Bernalillo | $80,000 |
GEORGIA O'KEEFFE ELEM SCHL PLAYGROUND IMPROVE | $30,000 | ($3,000) | Albuquerque PSD | Bernalillo | $33,000 |
APACHE ELEM SCHL SECURITY SYSTEMS | $21,500 | ($1,500) | Albuquerque PSD | Bernalillo | $23,000 |
RAMAH CHP PUMPER UNIT VEHICLE | $60,000 | ($1,314) | Ramah Chapter | Cibola | $61,314 |
VALENCIA CO EL CERRO MISSION WATER RIGHTS/WELL/SYS | $74,000 | ($1,000) | Valencia | $75,000 | |
GEORGE I. SANCHEZ CMTY SCHL FINE ARTS FCLTY | $20,000 | ($1,000) | Albuquerque PSD | Bernalillo | $21,000 |
JIMMY CARTER MID SCHL LANDSCAPING | $118,800 | ($800) | Albuquerque PSD | Bernalillo | $119,600 |
EAST RIO ARRIBA SWCD STORAGE BUILDING CONSTRUCT | $45,000 | ($450) | Hernandez | Rio Arriba | $45,450 |
TIERRA ANTIGUA ELEM SCHL SHADE STRUCTURES | $83,600 | ($400) | Albuquerque PSD | Bernalillo | $84,000 |
PICACHO HILLS AREA IMPROVE | $77,500 | ($117) | Las Cruces | Dona Ana | $77,617 |
KIRTLAND ELEM SCHL SECURITY SYSTEMS | $40,945 | ($55) | Albuquerque PSD | Bernalillo | $41,000 |
MONTE VISTA ELEM SCHL SECURITY SYSTEMS | $60,945 | ($55) | Albuquerque PSD | Bernalillo | $61,000 |
ALAMOGORDO POLICE DEPT VEHICLES | $200,000 | $- | Alamogordo | Otero | $200,000 |
ARTESIA GUADALUPE PARK IMPROVE | $192,500 | $- | Artesia | Eddy | $192,500 |
CAMELOT BLVD EXTENSION LOS LUNAS | $325,000 | $- | Los Lunas | Valencia | $325,000 |
DEXTER WATER SUPPLY LINE IMPROVE | $295,000 | $- | Dexter | Chaves | $295,000 |
CORONA WELLS IMPROVE | $60,000 | $- | Corona | Lincoln | $60,000 |
LINCOLN CO BLDG RUIDOSO HEATING/COOLING EQUIP | $60,000 | $- | Ruidoso | Lincoln | $60,000 |
LINCOLN CO GREENTREE SWA RECYCLING BALERS PRCHS | $20,000 | $- | Ruidoso Downs | Lincoln | $20,000 |
LINCOLN CO GREENTREE SWA TRANSFER TRAILER | $50,000 | $- | Ruidoso Downs | Lincoln | $50,000 |
MORIARTY FIRE DEPT TRAINING FCLTY | $300,000 | $- | Moriarty | Torrance | $300,000 |
NM MUSEUM OF SPACE HISTORY RESTROOMS | $175,000 | $- | Alamogordo | Otero | $175,000 |
NAVAJO TECH UNIV MOBILE HOME UNITS | $90,000 | $- | Crownpoint | McKinley | $90,000 |
LAS CRUCES FIRE STATION KITCHEN IMPROVE | $20,000 | $- | Las Cruces | Dona Ana | $20,000 |
PERALTA PUBLIC WORKS HEAVY EQUIPMENT | $50,000 | $- | Peralta | Valencia | $50,000 |
PERALTA TOWN HALL BLDG IMPROVEMENTS | $80,000 | $- | Peralta | Valencia | $80,000 |
RIO ARRIBA CO DETENTION CTR REN EXPAND | $100,000 | $- | Tierra Amarilla | Rio Arriba | $100,000 |
ROUTE 66 MAIN ST LIGHTING - MORIARTY | $35,000 | $- | Moriarty | Torrance | $35,000 |
RUIDOSO FIRE MITIGATION | $70,000 | $- | Ruidoso | Lincoln | $70,000 |
RUIDOSO RECREATIONAL FCLTY CONSTRUCT | $100,000 | $- | Ruidoso | Lincoln | $100,000 |
SUN VALLEY WSD RESIDENTIAL WATER METERS | $25,000 | $- | Lincoln | $25,000 | |
TIMBERON WSD DUMP TRUCK | $100,000 | $- | Timberon | Otero | $100,000 |
TIMBERON WSD GOLF COURSE GREENS MOWER | $30,000 | $- | Timberon | Otero | $30,000 |
CHAVES CO DISTRICT 8 VOL FIRE DEPT PARKING LOT | $25,000 | $- | Chaves | $25,000 | |
CHAVES CO SIERRA VOL FIRE STN BARRIER FENCE | $30,000 | $- | Chaves | $30,000 | |
ENMU-ROSWELL PHYSICAL PLANT SKID LOADER | $42,840 | $- | Roswell | Chaves | $42,840 |
HAGERMAN BASKETBALL COURT | $75,000 | $- | Hagerman | Chaves | $75,000 |
HAGERMAN RAILROAD WATER CROSSING | $49,500 | $- | Hagerman | Chaves | $49,500 |
ROSWELL SOUTH PARK CEMETERY ROADS IMPROVE | $150,000 | $- | Roswell | Chaves | $150,000 |
CARLSBAD IRRIGATION DIST DUMP TRUCK | $75,000 | $- | Carlsbad | Eddy | $75,000 |
CLOUDCROFT MUSEUM TACK BARN | $35,000 | $- | Cloudcroft | Otero | $35,000 |
CLOVIS MUNICIPAL AIRPORT ROAD IMPROVE | $135,000 | $- | Clovis | Curry | $135,000 |
CLOVIS RAILROAD DISTRICT ATSF LOCOMOTIVE IMPROVE | $40,000 | $- | Clovis | Curry | $40,000 |
CORONA PSD VEHICLE | $30,000 | $- | Corona PSD | Lincoln | $30,000 |
LOVINGTON EVIDENCE STORAGE FCLTY/IMPOUND LOT | $150,000 | $- | Lovington | Lea | $150,000 |
LOVINGTON MSD HEALTH CLINIC | $100,000 | $- | Lovington MSD | Lea | $100,000 |
RIO COMMUNITIES MUNICIPAL MLTPRPS COMPLEX PHASE 3 | $200,000 | $- | Rio Communities | Valencia | $200,000 |
SAN MIGUEL CO MAINTENANCE OPERATIONS VEHICLE | $35,000 | $- | Las Vegas | San Miguel | $35,000 |
UNM ATHLETIC TRAINING ROOM EQUIP | $100,000 | $- | Albuquerque | Bernalillo | $100,000 |
CLOUDCROFT MUSEUM FENCE | $25,600 | $- | Cloudcroft | Otero | $25,600 |
CLOVIS VETERAN PARK | $50,000 | $- | Clovis | Curry | $50,000 |
INDEPENDENCE HIGH SCHL MAIN ENTRY | $70,000 | $- | Rio Rancho PSD | Sandoval | $70,000 |
DEMING ROADS IMPROVE | $250,000 | $- | Deming | Luna | $250,000 |
MORIARTY HIGH SCHL PIANO LAB EQUIP | $34,000 | $- | Moriarty-Edgewood SD | Multiple Co. | $34,000 |
RIO RANCHO NORTH CMPLX BB FIELDS IMPROVE | $40,000 | $- | Rio Rancho | Sandoval | $40,000 |
RIO RANCHO SUNSET LITTLE LEAGUE SHADE STRUCT | $40,000 | $- | Rio Rancho | Sandoval | $40,000 |
ACEQUIA DEL LLANO GABIONS NAMBE IMPROVE | $20,000 | $- | Nambe | Santa Fe | $20,000 |
ALB CMTY BICYCLE RECYCLING PROGRAMS EQUIP | $6,200 | $- | Albuquerque | Bernalillo | $6,200 |
ALB PSD JROTC VEHICLE | $60,000 | $- | Albuquerque PSD | Bernalillo | $60,000 |
ALB PSD NUSENDA CMTY STADIUM SPORTS HALL OF FAME | $10,000 | $- | Albuquerque PSD | Bernalillo | $10,000 |
AMY BIEHL COMMUNITY SCHL WALKING TRACK | $16,000 | $- | Santa Fe PSD | Santa Fe | $16,000 |
CAPITAL HIGH SCHL PRACTICE FIELD SANTA FE PSD | $35,000 | $- | Santa Fe PSD | Santa Fe | $35,000 |
CHAMIZA ELEM SCHL SHADE STRUCTURES | $100,000 | $- | Albuquerque PSD | Bernalillo | $100,000 |
CRYSTAL CHP CHAPTER HOUSE PARKING LOT IMPROVE | $50,000 | $- | Crystal Chapter | San Juan | $50,000 |
DONA ANA CO ROAD SIDEWALKS - LA UNION | $12,765 | $- | Dona Ana | $12,765 | |
DULCE FIRE DEPT EQUIP JICARILLA APACHE NATION | $30,805 | $- | Dulce | Rio Arriba | $30,805 |
EAST MOUNTAIN HIGH SCHL BUS PURCHASE | $120,000 | $- | Albuquerque PSD | Bernalillo | $120,000 |
EL GUICU DITCH IMPROVE | $50,000 | $- | La Cienega | Santa Fe | $50,000 |
PENASCO ISD SECURITY GATES | $20,000 | $- | Penasco ISD | Taos | $20,000 |
ESTANCIA MSD AGRICULTURAL EDUCATION WORKSHOP | $24,200 | $- | Estancia MSD | Torrance | $24,200 |
FORT SELDEN HISTORIC SITE | $50,000 | $- | Radium Springs | Dona Ana | $50,000 |
GREENWICH RD IMPROVE SW VALLEY | $27,000 | $- | Bernalillo | $27,000 | |
HOOPER RD SW IMPROVE-BERN CO | $77,500 | $- | Bernalillo | $77,500 | |
HARRELSON ST ROW & RD IMPROVE LAS CRUCES | $300,000 | $- | Las Cruces | Dona Ana | $300,000 |
HATCH METER READING SYS | $275,500 | $- | Hatch | Dona Ana | $275,500 |
HATCH PUBLIC WORKS EQUIP | $40,000 | $- | Hatch | Dona Ana | $40,000 |
JAMES MONROE MID SCHL LIBRARIES | $75,000 | $- | Albuquerque PSD | Bernalillo | $75,000 |
JAMES MONROE MID SCHL TRACK AREAS | $125,000 | $- | Albuquerque PSD | Bernalillo | $125,000 |
JEMEZ PUEBLO ADOBE PRODUCTION BLDG CONSTRUCT | $150,000 | $- | Jemez Pueblo | Sandoval | $150,000 |
JEMEZ PUEBLO WATER METERS | $100,000 | $- | Jemez Pueblo | Sandoval | $100,000 |
LA JARA MDWC & MSWA WATER SYSTEM IMPROVE | $100,000 | $- | La Jara | Sandoval | $100,000 |
LAS CRUCES AMADOR HOTEL HAZARDOUS MATERIAL ABATE | $100,000 | $- | Las Cruces | Dona Ana | $100,000 |
LAS CRUCES AVE IMPROVE CAMPOS/TORNILLO | $75,000 | $- | Las Cruces | Dona Ana | $75,000 |
LAS CRUCES KLEIN PARK IMPROVE | $100,000 | $- | Las Cruces | Dona Ana | $100,000 |
LYNDON B. JOHNSON MID SCHL LIBRARIES | $75,000 | $- | Albuquerque PSD | Bernalillo | $75,000 |
MORIARTY HIGH SCHL SPECIAL EDUCATION CTR | $16,000 | $- | Moriarty-Edgewood MSD | Torrance | $16,000 |
MOUNTAIN MAHOGANY COMMUNITY SCHL INFO TECH | $19,000 | $- | Albuquerque | Bernalillo | $19,000 |
NAVAJO DAM DWC & MSWC DIGITAL WATER METERS | $10,000 | $- | San Juan | $10,000 | |
NM STATE RECORDS CTR MURAL | $40,000 | $- | Santa Fe | Santa Fe | $40,000 |
PALACE OF THE GOVERNORS PHOTO ARCHIVE EQUIP | $13,000 | $- | Santa Fe | Santa Fe | $13,000 |
PLACITAS WATER SYSTEM IMPROVE | $125,000 | $- | Placitas | Sandoval | $125,000 |
POJOAQUE VALLEY PSD NAMBE HEAD START FACILITY | $45,000 | $- | Pojoaque Valley PSD | Santa Fe | $45,000 |
ROOSEVELT MID SCHL TABLES & BENCHES | $50,000 | $- | Albuquerque PSD | Bernalillo | $50,000 |
SAN JUAN CHP SAN JUAN RIVER BRIDGE | $200,000 | $- | Fruitland | San Juan | $200,000 |
SAN ANTONITO ELEM SCHL LIBRARIES & BOOKROOMS | $29,000 | $- | Albuquerque PSD | Bernalillo | $29,000 |
SAN JUAN DINEH WATER USERS TRUCK & TRAILER | $114,759 | $- | Shiprock | San Juan | $114,759 |
SAN MIGUEL CO FAIRGROUNDS EXHIBIT HALL | $15,000 | $- | San Miguel | $15,000 | |
SANOSTEE CHP CHAPTER HOUSE IMPROVE | $25,000 | $- | Sanostee Chapter | San Juan | $25,000 |
SANTA FE CO CIVIL WAR MONUMENT | $50,000 | $- | Glorieta | Santa Fe | $50,000 |
SANTA ROSA CSD CAREER TECH EDUCATION CTR | $35,000 | $- | Santa Rosa CSD | Guadalupe | $35,000 |
SHIPROCK CHP WWATER SYSTEM & EXTENSION | $100,000 | $- | Shiprock Chapter | San Juan | $100,000 |
SIERRA VISTA ELEM SCHL SHADE STRUCTURES | $100,000 | $- | Albuquerque PSD | Bernalillo | $100,000 |
TAOS CO NORTHERN NM LAND GRANTS/ACEQUIA ARCHIVES | $100,000 | $- | Taos | Taos | $100,000 |
TIERRA ANTIGUA ELEM SCHL PARKING LOTS | $17,000 | $- | Albuquerque PSD | Bernalillo | $17,000 |
TRUMAN MID SCHL LIBRARIES & BOOKROOMS | $50,000 | $- | Albuquerque PSD | Bernalillo | $50,000 |
TSE'DAA'KAAN CHP POWER LINE EXTEND CONNECT | $75,000 | $- | Tse'Daa'Kaan Chapter | San Juan | $75,000 |
UNION CO RECORDS EQUIP | $75,000 | $- | Clayton | Union | $75,000 |
UNION CO VEHICLE PRCHS | $35,000 | $- | Clayton | Union | $35,000 |
UNM CHARLIE MORRISEY RESEARCH HALL | $85,000 | $- | Albuquerque | Bernalillo | $85,000 |
VADO SAL SI PUEDES CORRIDOR STUDY | $125,000 | $- | Vado | Dona Ana | $125,000 |
VENTANA RANCH ELEM SCHL SHADE STRUCTURES | $75,000 | $- | Albuquerque PSD | Bernalillo | $75,000 |
CLOVIS FOOD BANK FREEZER/COOLER FOUNDATION REPAIR | $70,000 | $- | Clovis | Curry | $70,000 |
CEDAR ST CONNECTION DEVELOP DEMING | $185,000 | $- | Deming | Luna | $185,000 |
ACEQUIA DE LOS FRESQUEZ DIVERSION DAM | $100,000 | $- | Santa Fe | $100,000 | |
ACEQUIA DE LOS MAESTAS IMPROVE | $75,000 | $- | La Puebla | Santa Fe | $75,000 |
ACEQUIA DE OJO SARCO PHASE 1 RIO ARRIBA CO | $35,000 | $- | Ojo Sarco | Rio Arriba | $35,000 |
ACEQUIA DEL BARRANCO DE JACONA IMPROVE | $30,000 | $- | Santa Fe | $30,000 | |
ALAMEDA ELEM SCHL SECURITY SYSTEMS | $85,000 | $- | Albuquerque PSD | Bernalillo | $85,000 |
ALAMO LN IMPROVE - AGUA FRIA | $70,000 | $- | Santa Fe | $70,000 | |
ALB VALLEY GARDENS PARK SHADE STRUCTURES IMPROVE | $15,000 | $- | Albuquerque | Bernalillo | $15,000 |
ALCALDE CEMETERY RIO ARRIBA CO | $40,000 | $- | Alcalde | Rio Arriba | $40,000 |
ANCONES MDW & WWCA WATER SYS | $150,000 | $- | La Madera | Rio Arriba | $150,000 |
ARROYO DEL OSO ELEM SCHL SECURITY SYSTEMS | $84,000 | $- | Albuquerque PSD | Bernalillo | $84,000 |
ATALAYA ELEM SCHL PLAYGROUND & BASKETBALL COURT | $75,000 | $- | Santa Fe PSD | Santa Fe | $75,000 |
BERN CO LOW-INCOME WOMEN CTR INFO TECH IMPROVE | $30,000 | $- | Albuquerque | Bernalillo | $30,000 |
CEC&EARLY COLLEGE ACADEMY LIBRARIES & BOOKROOMS | $25,000 | $- | Albuquerque PSD | Bernalillo | $25,000 |
CHAPARRAL ELEM SCHL SECURITY SYSTEMS | $43,000 | $- | Albuquerque PSD | Bernalillo | $43,000 |
CLAYTON GROUND WATER MONITORING WELL | $100,000 | $- | Clayton | Union | $100,000 |
CLOVIS ZOO ANIMALS AND INFRASTRUCTURE | $20,000 | $- | Clovis | Curry | $20,000 |
COBRE CSD ELEM SCHL ENTRANCE SECURITY IMPROVE | $45,000 | $- | Cobre CSD | Grant | $45,000 |
CURRY CO BROADVIEW FIRE STATION PHASE 1 | $200,000 | $- | Broadview | Curry | $200,000 |
DONA ANA CO SHERIFF'S DEPT CRIME DATA ANALYSIS SYS | $100,000 | $- | Las Cruces | Dona Ana | $100,000 |
DENNIS CHAVEZ ELEM SCHL SECURITY SYSTEMS | $78,000 | $- | Albuquerque PSD | Bernalillo | $78,000 |
DESERT RIDGE MID SCHL SHADE STRUCTURES | $180,000 | $- | Albuquerque PSD | Bernalillo | $180,000 |
DONA ANA CO RADIUM SPRINGS FIRE STATION 8 IMPROVE | $400,000 | $- | Las Cruces | Dona Ana | $400,000 |
DORA CSD BLEACHERS | $50,000 | $- | Dora CSD | Roosevelt | $50,000 |
DURANES ELEM SCHL MINI FIELDS | $93,000 | $- | Albuquerque PSD | Bernalillo | $93,000 |
EDMUND G. ROSS ELEM SCHL SECURITY SYSTEMS | $83,000 | $- | Albuquerque PSD | Bernalillo | $83,000 |
EL VALLE DE LOS RANCHOS WSD SEWER SYS PH 2D-1B | $50,000 | $- | Ranchos De Taos | Taos | $50,000 |
ELDORADO FIRE STATION #4 | $105,500 | $- | Eldorado | Santa Fe | $105,500 |
EMERSON ELEM SCHL PLAYGROUND IMPROVE | $230,000 | $- | Albuquerque PSD | Bernalillo | $230,000 |
EMERSON ELEM SCHL SECURITY SYSTEMS | $85,000 | $- | Albuquerque PSD | Bernalillo | $85,000 |
FLOYD MSD LIGHTING | $50,000 | $- | Floyd MSD | Roosevelt | $50,000 |
FORT SUMNER BOSQUE REDONDO MEMORIAL IMPROVE | $50,000 | $- | Fort Sumner | De Baca | $50,000 |
GARFIELD MID SCHL BASKETBALL/TENNIS COURT AREAS | $32,000 | $- | Albuquerque PSD | Bernalillo | $32,000 |
GRANT MID SCHL SECURITY SYSTEMS | $57,000 | $- | Albuquerque PSD | Bernalillo | $57,000 |
HURLEY COMMUNITY CENTER IMPROVE | $75,000 | $- | Hurley | Grant | $75,000 |
HURLEY WATER SYSTEM IMPROVE | $100,000 | $- | Hurley | Grant | $100,000 |
JEMEZ SPRINGS HEATING SYSTEM | $25,000 | $- | Jemez Springs | Sandoval | $25,000 |
JOHN ADAMS MID SCHL SECURITY SYSTEMS | $79,000 | $- | Albuquerque PSD | Bernalillo | $79,000 |
KENNEDY MID SCHL LIBRARIES & BOOKROOMS | $38,000 | $- | Albuquerque PSD | Bernalillo | $38,000 |
KENNEDY MID SCHL SECURITY SYSTEMS | $120,800 | $- | Albuquerque PSD | Bernalillo | $120,800 |
LA MESA ELEM SCHL LANDSCAPING | $68,000 | $- | Albuquerque PSD | Bernalillo | $68,000 |
LAS CRUCES EAST MESA PUBLIC SAFETY COMPLEX EQUIP | $50,000 | $- | Las Cruces | Dona Ana | $50,000 |
MANZANO HIGH SCHL FINE ARTS FACILITIES | $40,000 | $- | Albuquerque PSD | Bernalillo | $40,000 |
MCCURDY CHARTER SCHOOL LIBRARIES | $100,000 | $- | Espanola | Santa Fe | $100,000 |
MESCALERO APACHE TRIBE SEPTIC TRUCK | $90,000 | $- | Otero | $90,000 | |
NORTHSIDE ACEQUIA MADRE DE VILLANUEVA IMPROVE | $6,000 | $- | Villanueva | San Miguel | $6,000 |
NORTHSTAR ELEM SCHL SHADE STRUCTURES | $86,000 | $- | Albuquerque PSD | Bernalillo | $86,000 |
PECOS MID & HIGH SCHLS WINDOWS | $50,000 | $- | Pecos ISD | San Miguel | $50,000 |
RED LAKE CHP UTILITY LINES IMPROVE | $50,000 | $- | Red Lake Chapter | McKinley | $50,000 |
RIO ARRIBA CO ABIQUIU VFD CISTERN MEDANALES | $86,000 | $- | Medanales | Rio Arriba | $86,000 |
RIO ARRIBA CO DAV CHP 22 VEHICLE | $16,000 | $- | Espanola | Rio Arriba | $16,000 |
RIO EN MEDIO DITCH ASSOCIATION ALTO DITCH | $13,000 | $- | Santa Fe | $13,000 | |
RIO EN MEDIO DITCH ASSOCIATION CANADITA DITCH | $5,375 | $- | Santa Fe | $5,375 | |
RIO EN MEDIO DITCH ASSOCIATION MEDIO DITCH IMPROVE | $6,350 | $- | Santa Fe | Santa Fe | $6,350 |
SALAZAR COMMUNITY DITCH WATER METERING DEVICE | $30,000 | $- | Hernandez | Rio Arriba | $30,000 |
SANDIA HIGH SCHL FINE ARTS FACILITIES | $66,000 | $- | Albuquerque PSD | Bernalillo | $66,000 |
SPRINGER VETERANS MEMORIAL PARK RENOVATE | $5,000 | $- | Springer | Colfax | $5,000 |
TESUQUE ELEM SCHL FLOORING | $18,000 | $- | Santa Fe PSD | Santa Fe | $18,000 |
TESUQUE PUEBLO BACKHOE | $124,000 | $- | Tesuque Pueblo | Santa Fe | $124,000 |
TONY HILLERMAN MID SCHL TRACK AREAS | $150,000 | $- | Albuquerque PSD | Bernalillo | $150,000 |
TRUMAN MID SCHL SECURITY SYSTEMS | $25,000 | $- | Albuquerque PSD | Bernalillo | $25,000 |
VAN BUREN MID SCHL GYM | $112,000 | $- | Albuquerque PSD | Bernalillo | $112,000 |
WASHINGTON MID SCHL LIBRARIES & BOOKROOMS | $13,000 | $- | Albuquerque PSD | Bernalillo | $13,000 |
WEST MESA HIGH SCHL TRACK AREAS | $194,000 | $- | Albuquerque PSD | Bernalillo | $194,000 |
MESILLA MCDOWELL RD WASTEWATER SYS CONSTRUCT | $150,000 | $- | Mesilla | Dona Ana | $150,000 |
WILSON MID SCHL SECURITY SYSTEMS | $49,000 | $- | Albuquerque PSD | Bernalillo | $49,000 |
EAST MOUNTAIN HIGH SCHL INFO TECH | $25,000 | $- | Albuquerque PSD | Bernalillo | $25,000 |
ARCH HURLEY CONSERVANCY DISTRICT EQUIPMENT | $80,000 | $- | Multiple Co | $80,000 | |
BAYLOR CANYON RD CORRIDOR STUDY DONA ANA CO | $50,000 | $- | Dona Ana | $50,000 | |
BLOOMFIELD ALTERNATE WATER SUPPLY DIVERSION | $222,000 | $- | Bloomfield | San Juan | $222,000 |
EAST MOUNTAIN HIGH SCHOOL HVAC SYSTEM | $20,000 | $- | Albuquerque PSD | Bernalillo | $20,000 |
ERNIE PYLE MID SCHL BASKETBALL/TENNIS COURT AREAS | $35,000 | $- | Albuquerque PSD | Bernalillo | $35,000 |
MORIARTY FIRE DEPT GURNEYS | $75,000 | $- | Moriarty | Torrance | $75,000 |
MORIARTY HIGH SCHL CARPENTRY-FURNITURE BLDG | $50,000 | $- | Moriarty-Edgewood MSD | Multiple Co | $50,000 |
SANTA CLARA PUEBLO REGIONAL HEALTH CENTER | $125,000 | $- | Santa Clara Pueblo | Rio Arriba | $125,000 |
SIERRA CO GERONIMO SPRINGS MUSEUM HVAC | $25,000 | $- | Truth or Consequences | Sierra | $25,000 |
SOUTHWEST SWA ROLL-OFF BINS GRANT CO | $25,000 | $- | Grant | $25,000 | |
VALENCIA CO DON JOSE DOLORES CORDOVA CULTURAL CT | $100,000 | $- | Jarales | Valencia | $100,000 |
CHIMAYO/HERNANDEZ CMTY CTRS KITCHENS RIO ARRIBA C | $100,000 | $- | Rio Arriba | $100,000 | |
SAN JOAQUIN DEL RIO DE CHAMA LAND GRANT STORAGE | $15,000 | $- | Capulin | Rio Arriba | $15,000 |
MISSION ACHIEVEMENT & SUCCESS CHARTER SCHL LIBRAR | $50,000 | $- | Albuquerque | Bernalillo | $50,000 |
CESAR CHAVEZ COMMUNITY SCHL SECURITY | $60,250 | $250 | Albuquerque | Bernalillo | $60,000 |
SIERRA VISTA ELEM SCHL TRACK AREAS | $69,600 | $600 | Albuquerque PSD | Bernalillo | $69,000 |
VOLCANO VISTA HIGH SCHL GROUNDS RENOVATE | $47,800 | $800 | Albuquerque PSD | Bernalillo | $47,000 |
VENTANA RANCH ELEM SCHL SECURITY SYSTEMS | $82,400 | $1,400 | Albuquerque PSD | Bernalillo | $81,000 |
LAS CRUCES SENIOR CENTERS IMPROVE | $80,000 | $4,000 | Las Cruces | Dona Ana | $76,000 |
HED MESA PGM INFO TECH | $25,000 | $5,000 | Multiple Co | $20,000 | |
CHICHILTAH CHP BATHROOM ADDITIONS | $90,000 | $5,000 | Chichiltah Chapter | McKinley | $85,000 |
ALB ALVARADO PARK SIGNAGE & ELECTRICAL | $9,500 | $5,500 | Albuquerque | Bernalillo | $4,000 |
JACKSON MID SCHL SECURITY SYSTEMS | $20,000 | $6,000 | Albuquerque PSD | Bernalillo | $14,000 |
21ST CENTURY PUBLIC ACADEMY | $83,750 | $8,750 | Albuquerque PSD | Bernalillo | $75,000 |
ALBUQUERQUE HIGH SCHL PERFORMING ARTS FACILITIES | $135,945 | $9,945 | Albuquerque PSD | Bernalillo | $126,000 |
UNIVERSITY AVE PEDESTRIAN CROSSWALK SYS | $260,000 | $10,000 | Las Cruces | Dona Ana | $250,000 |
1ST JUDICIAL DISTRICT COURT VEHICLES | $70,000 | $10,000 | Santa Fe | Santa Fe | $60,000 |
LOWER RIO GRANDE PWWA SCADA INFO TECH | $90,000 | $10,000 | Dona Ana | $80,000 | |
EUBANK ELEM SCHL FINE ARTS FACILITIES | $25,000 | $10,000 | Albuquerque PSD | Bernalillo | $15,000 |
TAOS CO VETERANS CEMETERY | $110,000 | $10,000 | Taos | $100,000 | |
GUADALUPE CO THEATER RENOVATE | $185,000 | $10,000 | Santa Rosa | Guadalupe | $175,000 |
MESCALERO APACHE TRIBE SANITATION COLLECTION TRUC | $130,000 | $10,000 | Otero | $120,000 | |
RIO RANCHO FIRE & RESCUE DEPARTMENT EQUIPMENT | $68,010 | $12,164 | Rio Rancho | Sandoval | $55,846 |
GILBERT L. SENA CHARTER HIGH SCHL SECURITY | $87,500 | $12,500 | Albuquerque | Bernalillo | $75,000 |
UNM MANUFACTURING ENGINEERING PROGRAM DICER | $88,000 | $13,000 | Albuquerque | Bernalillo | $75,000 |
BERN CO NORTH VALLEY LITTLE LEAGUE SHADE STRUCT | $95,000 | $15,000 | Bernalillo | $80,000 | |
GRIEGOS ELEM SCHL LIBRARIES & BOOKROOMS | $45,000 | $15,000 | Albuquerque PSD | Bernalillo | $30,000 |
LAS CRUCES FIRE DEPARTMENT EQUIP | $250,000 | $17,000 | Las Cruces | Dona Ana | $233,000 |
MORIARTY WATER WELL/SCADA SYSTEM IMPROVE | $70,000 | $20,000 | Moriarty | Torrance | $50,000 |
UNM SAFETY LIGHTING | $120,000 | $20,000 | Albuquerque | Bernalillo | $100,000 |
H. HUMPHREY ELEM SCHL SECURITY SYSTEMS | $90,000 | $20,000 | Albuquerque PSD | Bernalillo | $70,000 |
OSUNA ELEM SCHL SECURITY SYSTEMS | $118,000 | $20,000 | Albuquerque PSD | Bernalillo | $98,000 |
QUAY CO DISTRICT ATTORNEY OFFICE RENOVATE | $150,000 | $20,000 | Tucumcari | Quay | $130,000 |
SANTA FE PSD EMERGENCY COMMAND CENTER | $75,000 | $25,000 | Santa Fe PSD | Santa Fe | $50,000 |
RIO RANCHO POLICE DEPT EVIDENCE STORAGE FCLTY | $225,000 | $25,000 | Rio Rancho | Sandoval | $200,000 |
CORRALES BUILDINGS AND SEPTIC SYS | $125,000 | $25,000 | Corrales | Sandoval | $100,000 |
UNM LGBTQ RESOURCE CENTER | $100,000 | $25,000 | Albuquerque | Bernalillo | $75,000 |
ACEQUIA DE LA CIENEGA RESERVOIR & IMPROVE | $68,522 | $25,000 | La Cienega | Santa Fe | $43,522 |
WHEELS MUSEUM BUILDING IMPROVE | $75,000 | $25,000 | Albuquerque | Bernalillo | $50,000 |
ROBERT F. KENNEDY HIGH SCHL INFO TECH | $126,000 | $26,000 | Albuquerque PSD | Bernalillo | $100,000 |
2ND JUDICIAL DISTRICT COURT VIDEO CAMERAS | $82,500 | $27,500 | Albuquerque | Bernalillo | $55,000 |
BERN CO COMMUNITY PANTRY TRUCKS | $139,100 | $29,100 | Albuquerque | Bernalillo | $110,000 |
ESPANOLA SPORTSPLEX IMPROVE | $82,000 | $32,000 | Espa̱ola | Rio Arriba | $50,000 |
ROSWELL FIRE STATIONS ROOFS & INFRASTRUCTURE | $195,000 | $35,000 | Roswell | Chaves | $160,000 |
UNM LINGUISTICS LAB | $135,000 | $35,000 | Albuquerque | Bernalillo | $100,000 |
CLAUNCH-PINTO SWCD METAL SHOP BLDG CONSTRUCT | $85,000 | $35,000 | Mountainair | Torrance | $50,000 |
LA COMUNIDAD DE LOS NINOS HEAD START WALL | $84,000 | $42,000 | Santa Fe | Santa Fe | $42,000 |
CORRALES FIRE STATION KITCHEN | $167,000 | $42,000 | Corrales | Sandoval | $125,000 |
TAYLOR MID SCHL TRACK AREAS | $145,000 | $45,000 | Albuquerque PSD | Bernalillo | $100,000 |
CTSRRC LOCOMOTIVE AND BOILER UPGRADES & REHAB | $300,000 | $50,000 | Multiple Co | $250,000 | |
UNM CRAIG ROBERTSON SOCCER COMPLEX EQUIP | $100,000 | $50,000 | Albuquerque | Bernalillo | $50,000 |
UNM POPEJOY HALL IMPROVE | $405,400 | $55,400 | Albuquerque | Bernalillo | $350,000 |
THOREAU CHP VETERANS SERVICE CENTER CONSTRUCT | $210,000 | $60,000 | Thoreau Chapter | McKinley | $150,000 |
DONA ANA CO FIRE TRAINING EQUIP | $135,000 | $80,000 | Las Cruces | Dona Ana | $55,000 |
LAS CRUCES BEHAVIORAL HEALTH PROGRAM INFO TECH | $280,735 | $100,735 | Las Cruces | Dona Ana | $180,000 |
BERN CO NM CIVIL JUSTICE CTR PLAN/DESIGN | $310,000 | $110,000 | Albuquerque | Bernalillo | $200,000 |
UNM NORTH GOLF COURSE OPEN SPACE IMPROVEMENTS | $320,000 | $120,000 | Albuquerque | Bernalillo | $200,000 |
ALB GUN VIOLENCE MEMORIAL | $229,000 | $129,000 | Albuquerque | Bernalillo | $100,000 |
NATIONAL HISPANIC CULTURAL CTR ANNEX & SITE | $639,500 | $139,500 | Albuquerque | Bernalillo | $500,000 |
ALB PARKS SECURITY | $401,000 | $386,000 | Albuquerque | Bernalillo | $15,000 |